Difference between revisions of "Run Planning Meeting Notes, Mar 04-Mar 11, 2020"

From GlueXWiki
Jump to: navigation, search
Line 15: Line 15:
 
#** ρ and ω yield/trigger back to nominal values (Alex)  
 
#** ρ and ω yield/trigger back to nominal values (Alex)  
 
#* [https://logbooks.jlab.org/entry/3798088 something weird] is fixed, was a bad ADC channel (Beni)  
 
#* [https://logbooks.jlab.org/entry/3798088 something weird] is fixed, was a bad ADC channel (Beni)  
 +
#* [https://logbooks.jlab.org/entry/3799401 gluonraid2 filled up and emptied by hand] (David)
 
#* [https://logbooks.jlab.org/entry/3797335 Bad data from CAEN HV] and intermittent LINK alarms (Hovanes)
 
#* [https://logbooks.jlab.org/entry/3797335 Bad data from CAEN HV] and intermittent LINK alarms (Hovanes)
 
# Run Plan (Friday + Weekend)
 
# Run Plan (Friday + Weekend)

Revision as of 07:37, 9 March 2020

<- Back to Run Coordination Meetings:Fall2019 Run Integrated trigger count

Monday, March 9

  1. Last 72 hours
    • Mostly production evening and overnight
  2. Reports/Issues
    • Rates instability: requested other Hall beam off and Harp Scan during "dip" in rate on Friday evening.
      • Since then the rate has been ~stable
    • Multiple processes running to different edge fitting scripts caused fluctuations i (Mark D)
      • New edge fitting script in use to better determine edge and width (Mark D)
    • Monitoring:
      • ρ and ω yield/trigger back to nominal values (Alex)
    • something weird is fixed, was a bad ADC channel (Beni)
    • gluonraid2 filled up and emptied by hand (David)
    • Bad data from CAEN HV and intermittent LINK alarms (Hovanes)
  3. Run Plan (Friday + Weekend)
    • Production
  4. Longer term
    • Hall C down for configuration change 3/13-3/20. Good opportunity for low current TAC run.

Friday, March 6

  1. Last 24 hours
    • Limited beam yesterday morning, followed by Hall access for Solenoid VCL work (Scot/Mark)
    • Steady production evening and overnight
  2. Reports/Issues
  3. Run Plan (Friday + Weekend)
    • May be some additional (short) injector tuning (A2 interception) today to keep Hall A's charge asymmetry down.
    • Production
  4. Longer term
    • Hall C down for configuration change 3/13-3/20. Good opportunity for low current TAC run.

Thursday, March 5

  1. Last 24 hours
  2. Reports/Issues
  3. Run Plan
    • Opportunistic access for solenoid work in parallel with injector tuning (1:00 pm)
    • Production