Difference between revisions of "Run Planning Meeting Notes, Mar 04-Mar 11, 2020"

From GlueXWiki
Jump to: navigation, search
(Monday, March 9)
(Monday, March 9)
Line 10: Line 10:
 
#**  
 
#**  
 
#** Since then the rate has been ~stable
 
#** Since then the rate has been ~stable
 +
#* [https://logbooks.jlab.org/entry/3799097 Convergence]
 
#* Multiple processes running to different edge fitting scripts caused fluctuations (Mark D)
 
#* Multiple processes running to different edge fitting scripts caused fluctuations (Mark D)
#** New edge fitting script in use to better determine edge and width (Mark D)
+
#** New edge fitting script in use to better [https://logbooks.jlab.org/entry/3799337 monitor edge and width] (Mark D)
 
#* [https://logbooks.jlab.org/entry/3799518 Collecting events before run start]
 
#* [https://logbooks.jlab.org/entry/3799518 Collecting events before run start]
 
#* Monitoring:
 
#* Monitoring:
 
#** [https://logbooks.jlab.org/entry/3799996 BCAL hot channel] --> pedestal calibration needed (Mark)
 
#** [https://logbooks.jlab.org/entry/3799996 BCAL hot channel] --> pedestal calibration needed (Mark)
 
#* [https://logbooks.jlab.org/entry/3798088 something weird] is fixed, was a bad ADC channel (Beni)  
 
#* [https://logbooks.jlab.org/entry/3798088 something weird] is fixed, was a bad ADC channel (Beni)  
#* [https://logbooks.jlab.org/entry/3799401 gluonraid2 filled up and emptied by hand] (David)
+
#* [https://logbooks.jlab.org/entry/3799352 gluonraid2 filled up] and [https://logbooks.jlab.org/entry/3799401 emptied by hand] (David)
 
#* [https://logbooks.jlab.org/entry/3797335 Bad data from CAEN HV] and intermittent LINK alarms (Hovanes)
 
#* [https://logbooks.jlab.org/entry/3797335 Bad data from CAEN HV] and intermittent LINK alarms (Hovanes)
 
# Run Plan (Friday + Weekend)
 
# Run Plan (Friday + Weekend)

Revision as of 08:13, 9 March 2020

<- Back to Run Coordination Meetings:Fall2019 Run Integrated trigger count

Monday, March 9

  1. Last 72 hours
    • Issues with delivering full current to A/C. Back up now, but no RF recovery planned/available to recover gradient(?)
    • Production running when beam available over the weekend
  2. Reports/Issues
  3. Run Plan (Friday + Weekend)
    • Production
  4. Longer term
    • Hall C down for configuration change 3/13-3/20. Good opportunity for low current TAC run.

Friday, March 6

  1. Last 24 hours
    • Limited beam yesterday morning, followed by Hall access for Solenoid VCL work (Scot/Mark)
    • Steady production evening and overnight
  2. Reports/Issues
  3. Run Plan (Friday + Weekend)
    • May be some additional (short) injector tuning (A2 interception) today to keep Hall A's charge asymmetry down.
    • Production
  4. Longer term
    • Hall C down for configuration change 3/13-3/20. Good opportunity for low current TAC run.

Thursday, March 5

  1. Last 24 hours
  2. Reports/Issues
  3. Run Plan
    • Opportunistic access for solenoid work in parallel with injector tuning (1:00 pm)
    • Production