Difference between revisions of "Run Planning Meeting Notes, Mar 04-Mar 11, 2020"

From GlueXWiki
Jump to: navigation, search
(Monday, March 9)
(Monday, March 9)
Line 7: Line 7:
 
#* Production running when beam available over the weekend
 
#* Production running when beam available over the weekend
 
# Reports/Issues
 
# Reports/Issues
#* Rates instability: "dip" in rate on Friday evening.
+
#* Rates instability: [https://logbooks.jlab.org/entry/3798851 "dips" in rate] on Friday evening.
 
#** [https://logbooks.jlab.org/entry/3798772 beam off to other halls showed no change to PS rate]
 
#** [https://logbooks.jlab.org/entry/3798772 beam off to other halls showed no change to PS rate]
 
#** Harp scan taken during dip: analysis by [https://logbooks.jlab.org/entry/3798744 shift crew (HALO:T:gamma)] and [https://logbooks.jlab.org/entry/3798822 Hovanes (HALO:T:electron)] and  [https://logbooks.jlab.org/entry/3799097 Jay's convergence]
 
#** Harp scan taken during dip: analysis by [https://logbooks.jlab.org/entry/3798744 shift crew (HALO:T:gamma)] and [https://logbooks.jlab.org/entry/3798822 Hovanes (HALO:T:electron)] and  [https://logbooks.jlab.org/entry/3799097 Jay's convergence]

Revision as of 08:36, 9 March 2020

<- Back to Run Coordination Meetings:Fall2019 Run Integrated trigger count

Monday, March 9

  1. Last 72 hours
    • Issues with delivering full current to A/C. Back up now, but no RF recovery planned/available to recover gradient(?)
    • Production running when beam available over the weekend
  2. Reports/Issues
  3. Run Plan (Friday + Weekend)
    • Production
  4. Longer term
    • Hall C down for configuration change 3/13-3/20. Good opportunity for low current TAC run.

Friday, March 6

  1. Last 24 hours
    • Limited beam yesterday morning, followed by Hall access for Solenoid VCL work (Scot/Mark)
    • Steady production evening and overnight
  2. Reports/Issues
  3. Run Plan (Friday + Weekend)
    • May be some additional (short) injector tuning (A2 interception) today to keep Hall A's charge asymmetry down.
    • Production
  4. Longer term
    • Hall C down for configuration change 3/13-3/20. Good opportunity for low current TAC run.

Thursday, March 5

  1. Last 24 hours
  2. Reports/Issues
  3. Run Plan
    • Opportunistic access for solenoid work in parallel with injector tuning (1:00 pm)
    • Production