(Monday, March 9)
Line 18: Line 18:
 
#* [https://logbooks.jlab.org/entry/3799352 gluonraid2 filled up] and [https://logbooks.jlab.org/entry/3799401 emptied by hand] (David)
 
#* [https://logbooks.jlab.org/entry/3799352 gluonraid2 filled up] and [https://logbooks.jlab.org/entry/3799401 emptied by hand] (David)
 
#* [https://logbooks.jlab.org/entry/3797335 Bad data from CAEN HV] and intermittent LINK alarms (Hovanes)
 
#* [https://logbooks.jlab.org/entry/3797335 Bad data from CAEN HV] and intermittent LINK alarms (Hovanes)
# Run Plan (Friday + Weekend)
+
# Run Plan
 
#* Production
 
#* Production
 
# Longer term
 
# Longer term

Revision as of 08:43, 9 March 2020

<- Back to Run Coordination Meetings:Fall2019 Run Integrated trigger count

Monday, March 9

  1. Last 72 hours
    • Issues with delivering full current to A/C. Back up now, but no RF recovery planned/available to recover gradient(?)
    • Production running when beam available over the weekend
  2. Reports/Issues
  3. Run Plan
    • Production
  4. Longer term
    • Hall C down for configuration change 3/13-3/20. Good opportunity for low current TAC run.

Friday, March 6

  1. Last 24 hours
    • Limited beam yesterday morning, followed by Hall access for Solenoid VCL work (Scot/Mark)
    • Steady production evening and overnight
  2. Reports/Issues
  3. Run Plan (Friday + Weekend)
    • May be some additional (short) injector tuning (A2 interception) today to keep Hall A's charge asymmetry down.
    • Production
  4. Longer term
    • Hall C down for configuration change 3/13-3/20. Good opportunity for low current TAC run.

Thursday, March 5

  1. Last 24 hours
  2. Reports/Issues
  3. Run Plan
    • Opportunistic access for solenoid work in parallel with injector tuning (1:00 pm)
    • Production