(Monday, March 9)
Line 1: Line 1:
 
<- Back to [[Run Coordination Meetings:Fall2019 Run]]
 
<- Back to [[Run Coordination Meetings:Fall2019 Run]]
 
[https://halldweb.jlab.org/data_monitoring/run_statistics/RunPeriod-2019-11/index.html Integrated trigger count]
 
[https://halldweb.jlab.org/data_monitoring/run_statistics/RunPeriod-2019-11/index.html Integrated trigger count]
 +
 +
<!--
 +
== Wedesday, March 11 ==
 +
# Last 24 hours
 +
# Reports/Issues
 +
# Run Plan
 +
-->
 +
 +
== Tuesday, March 10 ==
 +
# Last 24 hours
 +
# Reports/Issues
 +
# Run Plan
  
 
== Monday, March 9 ==
 
== Monday, March 9 ==

Revision as of 10:08, 9 March 2020

<- Back to Run Coordination Meetings:Fall2019 Run Integrated trigger count


Tuesday, March 10

  1. Last 24 hours
  2. Reports/Issues
  3. Run Plan

Monday, March 9

  1. Last 72 hours
    • Issues with delivering full current to A/C. Back up now, but no RF recovery planned/available to recover gradient(?)
    • Production running when beam available over the weekend
  2. Reports/Issues
  3. Run Plan
    • Production
  4. Longer term
    • Hall C down for configuration change 3/13-3/20. Good opportunity for low current TAC run.

Friday, March 6

  1. Last 24 hours
    • Limited beam yesterday morning, followed by Hall access for Solenoid VCL work (Scot/Mark)
    • Steady production evening and overnight
  2. Reports/Issues
  3. Run Plan (Friday + Weekend)
    • May be some additional (short) injector tuning (A2 interception) today to keep Hall A's charge asymmetry down.
    • Production
  4. Longer term
    • Hall C down for configuration change 3/13-3/20. Good opportunity for low current TAC run.

Thursday, March 5

  1. Last 24 hours
  2. Reports/Issues
  3. Run Plan
    • Opportunistic access for solenoid work in parallel with injector tuning (1:00 pm)
    • Production