(Tuesday, March 10)
(Tuesday, March 10)
Line 11: Line 11:
 
== Tuesday, March 10 ==
 
== Tuesday, March 10 ==
 
# Last 24 hours
 
# Last 24 hours
#* Pedestal run addressed BCAL hot channel
+
#* Pedestal run addressed BCAL hot channel, followed by production running
 
#* Vacuum valve closed (investigation underway):  Opportunistic access now(?)
 
#* Vacuum valve closed (investigation underway):  Opportunistic access now(?)
 
# Reports/Issues
 
# Reports/Issues
#* Rates and their ratios (Alexandre)
+
#* [https://logbooks.jlab.org/entry/3801218 Rates and their ratios] (Alexandre)
 
#* Energy jump (Alexandre)
 
#* Energy jump (Alexandre)
 
#* BCAL LED pulser is working [https://logbooks.jlab.org/entry/3800498] [https://logbooks.jlab.org/entry/3800712]
 
#* BCAL LED pulser is working [https://logbooks.jlab.org/entry/3800498] [https://logbooks.jlab.org/entry/3800712]
#* Monitoring:
+
#* Monitoring: [https://logbooks.jlab.org/entry/3800713 FDC occupancy]
#** [https://logbooks.jlab.org/entry/3800713 FDC occupancy]
+
#**
+
 
# Run Plan
 
# Run Plan
#* Production
+
#* Opportunistic access for FCAL and CCAL
 +
#* Production after access
  
 
== Monday, March 9 ==
 
== Monday, March 9 ==

Revision as of 08:21, 10 March 2020

<- Back to Run Coordination Meetings:Fall2019 Run Integrated trigger count


Tuesday, March 10

  1. Last 24 hours
    • Pedestal run addressed BCAL hot channel, followed by production running
    • Vacuum valve closed (investigation underway): Opportunistic access now(?)
  2. Reports/Issues
  3. Run Plan
    • Opportunistic access for FCAL and CCAL
    • Production after access

Monday, March 9

  1. Last 72 hours
    • Issues with delivering full current to A/C. Back up now, but no RF recovery planned/available to recover gradient(?)
    • Production running when beam available over the weekend
  2. Reports/Issues
  3. Run Plan
    • Production
  4. Longer term
    • Hall C down for configuration change 3/13-3/20. Good opportunity for low current TAC run.

Friday, March 6

  1. Last 24 hours
    • Limited beam yesterday morning, followed by Hall access for Solenoid VCL work (Scot/Mark)
    • Steady production evening and overnight
  2. Reports/Issues
  3. Run Plan (Friday + Weekend)
    • May be some additional (short) injector tuning (A2 interception) today to keep Hall A's charge asymmetry down.
    • Production
  4. Longer term
    • Hall C down for configuration change 3/13-3/20. Good opportunity for low current TAC run.

Thursday, March 5

  1. Last 24 hours
  2. Reports/Issues
  3. Run Plan
    • Opportunistic access for solenoid work in parallel with injector tuning (1:00 pm)
    • Production