(Thursday March 2)
(Thursday March 2)
Line 16: Line 16:
 
* TAGM work on radiated crates
 
* TAGM work on radiated crates
 
* Production runs
 
* Production runs
 +
* After separate ACC issue beam came back 22:05 or so. Thought we were not reaching Richard so I gave him a call at 22:30 just to make sure. Call is successful and Richard goes ahead and does studies on the TagM gains
  
 
=== Shift Reports ===
 
=== Shift Reports ===
Line 44: Line 45:
  
 
*Will we need a harp scan? MCC took away beam quite a while yesterday (nearly 14 hours before we got beam back)
 
*Will we need a harp scan? MCC took away beam quite a while yesterday (nearly 14 hours before we got beam back)
*Richard wants to do a run with specific settings on TAGM to check gains. This was to be set for primetime Wednesday night if beam came back. 1 hr became 4 hr and shift crew failed to reach him. Maybe table to tomorrow
 
 
*Sasha left segments of detector prototype for RadCon survey on Survey Table. He looks to ask the likes of Scot for guidance.
 
*Sasha left segments of detector prototype for RadCon survey on Survey Table. He looks to ask the likes of Scot for guidance.

Revision as of 23:39, 1 March 2023

Zoom connect Meeting ID: 160 199 0060 / Passcode 8394

MCC whiteboard

Hall D counting room white board

Spreadsheet with list of runs

Integrated Trigger Count


Thursday March 2

Past 24 hours

  • MCC "Maintenance Day"
  • TAGM work on radiated crates
  • Production runs
  • After separate ACC issue beam came back 22:05 or so. Thought we were not reaching Richard so I gave him a call at 22:30 just to make sure. Call is successful and Richard goes ahead and does studies on the TagM gains

Shift Reports

Early Riser Day Swing [ Owl]

Reports


Issues

Plans

  • Production (300 nA, 2h runs) with cycle:
    • 2 runs PARA (0/90)
    • 2 runs PERP (0/90)
    • 2 runs PARA (45/135)
    • 2 runs PERP (45/135)
    • 1 run AMO (use it to rejuvenate AMO reference in CBREM EPICS GUI)
  • Will we need a harp scan? MCC took away beam quite a while yesterday (nearly 14 hours before we got beam back)
  • Sasha left segments of detector prototype for RadCon survey on Survey Table. He looks to ask the likes of Scot for guidance.