Difference between revisions of "Run Planning Meeting Notes, March 1 - March 8, 2023"

From GlueXWiki
Jump to: navigation, search
(Thursday March 2)
(Thursday March 2)
Line 38: Line 38:
 
* [https://logbooks.jlab.org/entry/4141445 TAGM tripped off] (MCC - Daniel)
 
* [https://logbooks.jlab.org/entry/4141445 TAGM tripped off] (MCC - Daniel)
 
* [https://logbooks.jlab.org/entry/4141808 RF TDC]  
 
* [https://logbooks.jlab.org/entry/4141808 RF TDC]  
* MCC reports some phase shifts for beam @ 5th pass
+
* MCC reports some phase shifts for beam @ 5th pass (all halls)
  
 
=== Plans ===  
 
=== Plans ===  

Revision as of 08:26, 2 March 2023

Zoom connect Meeting ID: 160 199 0060 / Passcode 8394

MCC whiteboard

Hall D counting room white board

Spreadsheet with list of runs

Integrated Trigger Count


Thursday March 2

Past 24 hours

  • MCC "Maintenance Day"
  • TAGM work on radiated crates
  • Production runs
  • After separate ACC issue beam came back 22:05 or so. Thought we were not reaching Richard so I gave him a call at 22:30 just to make sure. Call is successful and Richard goes ahead and does studies on the TagM gains

Shift Reports

Early Riser Day Swing Owl

Reports

Issues

Plans

  • Production (300 nA, 2h runs) with cycle:
    • 2 runs PARA (0/90)
    • 2 runs PERP (0/90)
    • 2 runs PARA (45/135)
    • 2 runs PERP (45/135)
    • 1 run AMO (use it to rejuvenate AMO reference in CBREM EPICS GUI)
  • Sasha left segments of detector prototype for RadCon survey on Survey Table. He looks to ask the likes of Scot for guidance as RadCon will have to come when beam is down for a sustained period time.
  • Will we need a harp scan? MCC took away beam quite a while yesterday (nearly 14 hours before we got beam back)