Difference between revisions of "Run Planning Meeting Notes, March 1 - March 8, 2023"

From GlueXWiki
Jump to: navigation, search
(Past 24 hours)
(Thursday March 2)
Line 8: Line 8:
  
 
[https://halldweb.jlab.org/data_monitoring/run_statistics/RunPeriod-2023-01/index.html Integrated Trigger Count]
 
[https://halldweb.jlab.org/data_monitoring/run_statistics/RunPeriod-2023-01/index.html Integrated Trigger Count]
 +
 +
 +
= Friday March 3 =
 +
 +
=== Past 24 hours ===
 +
* RadCon surveyed the detector prototype and it has been removed
 +
* ACC downtimes: 2L25 solenoid, BLM trips
 +
 +
=== Shift Reports ===
 +
[https://logbooks.jlab.org/entry/4141803 Early Riser]
 +
[https://logbooks.jlab.org/entry/4142001 Day]
 +
[ Swing]
 +
[ Owl]
 +
 +
=== Reports ===
 +
*
 +
 +
=== Issues ===
 +
*
 +
 +
=== Plans ===
 +
* '''TAC Run'''
 +
*Production (300 nA, 2h runs) with cycle:
 +
**2 runs PARA (0/90)
 +
**2 runs PERP (0/90)
 +
**2 runs PARA (45/135)
 +
**2 runs PERP (45/135)
 +
**1 run AMO (use it to rejuvenate AMO reference in CBREM EPICS GUI)
  
  

Revision as of 16:30, 2 March 2023

Zoom connect Meeting ID: 160 199 0060 / Passcode 8394

MCC whiteboard

Hall D counting room white board

Spreadsheet with list of runs

Integrated Trigger Count


Friday March 3

Past 24 hours

  • RadCon surveyed the detector prototype and it has been removed
  • ACC downtimes: 2L25 solenoid, BLM trips

Shift Reports

Early Riser Day [ Swing] [ Owl]

Reports

Issues

Plans

  • TAC Run
  • Production (300 nA, 2h runs) with cycle:
    • 2 runs PARA (0/90)
    • 2 runs PERP (0/90)
    • 2 runs PARA (45/135)
    • 2 runs PERP (45/135)
    • 1 run AMO (use it to rejuvenate AMO reference in CBREM EPICS GUI)


Thursday March 2

Past 24 hours

  • MCC "Maintenance Day"
  • TAGM diagnosis, row checks
  • Production runs (Late MCC Swing and Owl)
  • After separate ACC issue beam came back 22:05 or so. Thought we were not reaching Richard so I gave him a call at 22:30 just to make sure. Call is successful and Richard goes ahead and does studies on the TagM gains

Shift Reports

Early Riser Day Swing Owl

Reports

Issues

Plans

  • Production (300 nA, 2h runs) with cycle:
    • 2 runs PARA (0/90)
    • 2 runs PERP (0/90)
    • 2 runs PARA (45/135)
    • 2 runs PERP (45/135)
    • 1 run AMO (use it to rejuvenate AMO reference in CBREM EPICS GUI)
  • Sasha left segments of detector prototype for RadCon survey on Survey Table. He looks to ask the likes of Scot for guidance as RadCon will have to come when beam is down for a sustained period time.
  • Will we need a harp scan? MCC took away beam quite a while yesterday (nearly 14 hours before we got beam back)