Difference between revisions of "Run Planning Meeting Notes, March 1 - March 8, 2023"

From GlueXWiki
Jump to: navigation, search
(Friday March 3)
(Friday March 3)
Line 23: Line 23:
  
 
=== Reports ===
 
=== Reports ===
 +
* [https://logbooks.jlab.org/entry/4141991 100V 500V ISEG locations](Mark)
 
* [https://logbooks.jlab.org/entry/4141997 RF TDC cable reconnected] (Lubomir)
 
* [https://logbooks.jlab.org/entry/4141997 RF TDC cable reconnected] (Lubomir)
 
* [https://logbooks.jlab.org/entry/4142057 CCAL crate added to DAQ config] (Sasha)
 
* [https://logbooks.jlab.org/entry/4142057 CCAL crate added to DAQ config] (Sasha)

Revision as of 17:45, 2 March 2023

Zoom connect Meeting ID: 160 199 0060 / Passcode 8394

MCC whiteboard

Hall D counting room white board

Spreadsheet with list of runs

Integrated Trigger Count


Friday March 3

Past 24 hours

  • RadCon surveyed the detector prototype and it has been removed
  • ACC downtimes: 2L25 solenoid, BLM trips

Shift Reports

Early Riser Day Swing [ Owl]

Reports

Issues

Plans

  • TAC Run (Sasha/Alexandre)
  • Production (300 nA, 2h runs) with cycle:
    • 2 runs PARA (0/90)
    • 2 runs PERP (0/90)
    • 2 runs PARA (45/135)
    • 2 runs PERP (45/135)
    • 1 run AMO (use it to rejuvenate AMO reference in CBREM EPICS GUI)

Thursday March 2

Past 24 hours

  • MCC "Maintenance Day"
  • TAGM diagnosis, row checks
  • Production runs (Late MCC Swing and Owl)
  • After separate ACC issue beam came back 22:05 or so. Thought we were not reaching Richard so I gave him a call at 22:30 just to make sure. Call is successful and Richard goes ahead and does studies on the TagM gains

Shift Reports

Early Riser Day Swing Owl

Reports

Issues

Plans

  • Production (300 nA, 2h runs) with cycle:
    • 2 runs PARA (0/90)
    • 2 runs PERP (0/90)
    • 2 runs PARA (45/135)
    • 2 runs PERP (45/135)
    • 1 run AMO (use it to rejuvenate AMO reference in CBREM EPICS GUI)
  • Sasha left segments of detector prototype for RadCon survey on Survey Table. He looks to ask the likes of Scot for guidance as RadCon will have to come when beam is down for a sustained period time.
  • Will we need a harp scan? MCC took away beam quite a while yesterday (nearly 14 hours before we got beam back)