Difference between revisions of "Run Planning Meeting Notes, March 1 - March 8, 2023"

From GlueXWiki
Jump to: navigation, search
(Friday March 3)
(Friday March 3)
Line 15: Line 15:
 
* RadCon surveyed the detector prototype and it has been removed
 
* RadCon surveyed the detector prototype and it has been removed
 
* ACC downtimes: 2L25 solenoid, BLM trips
 
* ACC downtimes: 2L25 solenoid, BLM trips
 +
* [https://logbooks.jlab.org/entry/4142313 Harp scan] in Swing. The fits are "OK" though there have probably been better
 +
* Sasha goes into Hall to work on CCAL crates
 +
* Richard Jones does Normalization run using AMO with only Row 4 of TAGM to further the study.
  
 
=== Shift Reports ===
 
=== Shift Reports ===

Revision as of 22:27, 2 March 2023

Zoom connect Meeting ID: 160 199 0060 / Passcode 8394

MCC whiteboard

Hall D counting room white board

Spreadsheet with list of runs

Integrated Trigger Count


Friday March 3

Past 24 hours

  • RadCon surveyed the detector prototype and it has been removed
  • ACC downtimes: 2L25 solenoid, BLM trips
  • Harp scan in Swing. The fits are "OK" though there have probably been better
  • Sasha goes into Hall to work on CCAL crates
  • Richard Jones does Normalization run using AMO with only Row 4 of TAGM to further the study.

Shift Reports

Early Riser Day Swing [ Owl]

Reports

Issues

Plans

  • TAC Run (Sasha/Alexandre)
  • Production (300 nA, 2h runs) with cycle:
    • 2 runs PARA (0/90)
    • 2 runs PERP (0/90)
    • 2 runs PARA (45/135)
    • 2 runs PERP (45/135)
    • 1 run AMO (use it to rejuvenate AMO reference in CBREM EPICS GUI)

Thursday March 2

Past 24 hours

  • MCC "Maintenance Day"
  • TAGM diagnosis, row checks
  • Production runs (Late MCC Swing and Owl)
  • After separate ACC issue beam came back 22:05 or so. Thought we were not reaching Richard so I gave him a call at 22:30 just to make sure. Call is successful and Richard goes ahead and does studies on the TagM gains

Shift Reports

Early Riser Day Swing Owl

Reports

Issues

Plans

  • Production (300 nA, 2h runs) with cycle:
    • 2 runs PARA (0/90)
    • 2 runs PERP (0/90)
    • 2 runs PARA (45/135)
    • 2 runs PERP (45/135)
    • 1 run AMO (use it to rejuvenate AMO reference in CBREM EPICS GUI)
  • Sasha left segments of detector prototype for RadCon survey on Survey Table. He looks to ask the likes of Scot for guidance as RadCon will have to come when beam is down for a sustained period time.
  • Will we need a harp scan? MCC took away beam quite a while yesterday (nearly 14 hours before we got beam back)