Run Planning Meeting Notes, March 1 - March 8, 2023

From GlueXWiki
Revision as of 00:10, 4 March 2023 by Terbora (Talk | contribs) (Monday March 6)

Jump to: navigation, search

Zoom connect Meeting ID: 160 199 0060 / Passcode 8394

MCC whiteboard

Hall D counting room white board

Spreadsheet with list of runs

Integrated Trigger Count


Monday March 6

Past 72 hours

  • Justin went into Hall to fix DIRC comm issue, looks good
  • DAQ error - Sasha rearranged wires, good to go

Shift Reports

3/5 [ Early Riser] [ Day] [ Swing] [ Owl] 3/4 [ Early Riser] [ Day] [Swing] [ Owl] 3/3 Early Riser Day Swing Owl

Reports

Issues

  • DAQ had failure with some ROCs, needed work from Sasha and Sergey, completed by Sasha late Swing
  • Coherent Edge (Phoebe)

Plans

  • TAC Run (Sasha/Alexandre)
  • Production (300 nA, 2h runs) with cycle:
    • 2 runs PARA (0/90)
    • 2 runs PERP (0/90)
    • 2 runs PARA (45/135)
    • 2 runs PERP (45/135)
    • 1 run AMO (use it to rejuvenate AMO reference in CBREM EPICS GUI)

Friday March 3

Past 24 hours

  • RadCon surveyed the detector prototype and it has been removed
  • ACC downtimes: 2L25 solenoid, BLM trips, 1L09 HV
  • Harp scan in Swing. The fits are "OK" though there have probably been better
  • Richard Jones does Normalization run using AMO with only Row 4 of TAGM to further the study.
  • OWL: resume production

Shift Reports

Early Riser Day Swing Owl

Reports

Issues

  • Administrative: Error Connecting to VNC Suite - port 33 somewhat got killed. use 5901 or 5902 - part of it is my fault, due to remembering the wrong password...
  • DIRC alarms becoming more frequent [1] [2] [3] [4]
  • One FCAL lockup reported OWL shift

Plans

  • TAC Run (Sasha/Alexandre)
  • Production (300 nA, 2h runs) with cycle:
    • 2 runs PARA (0/90)
    • 2 runs PERP (0/90)
    • 2 runs PARA (45/135)
    • 2 runs PERP (45/135)
    • 1 run AMO (use it to rejuvenate AMO reference in CBREM EPICS GUI)

Thursday March 2

Past 24 hours

  • MCC "Maintenance Day"
  • TAGM diagnosis, row checks
  • Production runs (Late MCC Swing and Owl)
  • After separate ACC issue beam came back 22:05 or so. Thought we were not reaching Richard so I gave him a call at 22:30 just to make sure. Call is successful and Richard goes ahead and does studies on the TagM gains

Shift Reports

Early Riser Day Swing Owl

Reports

Issues

Plans

  • Production (300 nA, 2h runs) with cycle:
    • 2 runs PARA (0/90)
    • 2 runs PERP (0/90)
    • 2 runs PARA (45/135)
    • 2 runs PERP (45/135)
    • 1 run AMO (use it to rejuvenate AMO reference in CBREM EPICS GUI)
  • Sasha left segments of detector prototype for RadCon survey on Survey Table. He looks to ask the likes of Scot for guidance as RadCon will have to come when beam is down for a sustained period time.
  • Will we need a harp scan? MCC took away beam quite a while yesterday (nearly 14 hours before we got beam back)