Difference between revisions of "Run Planning Meeting Notes, November 24 - November 30, 2022"

From GlueXWiki
Jump to: navigation, search
(Issues)
(Since the morning meeting)
 
(48 intermediate revisions by the same user not shown)
Line 8: Line 8:
  
 
Back to [[Run Coordination Meetings:Fall2022]]
 
Back to [[Run Coordination Meetings:Fall2022]]
 +
 +
 +
= Wednesday Nov 30 =
 +
=== Since the morning meeting ===
 +
* [https://logbooks.jlab.org/entry/4093179 fa125 replaced for FDC]
 +
* [https://logbooks.jlab.org/entry/4093177 fa250 replaced for FCAL]
 +
* Filled the target
 +
* 11am update from Igal: 2.2B triggers for empty target, 15.4B triggers for full
 +
 +
=== Updates from the last 24h ===
 +
* [https://logbooks.jlab.org/entry/4092964 FDC fadc replaced]
 +
* [https://logbooks.jlab.org/entry/4093042 BCAL fadc replaced]
 +
* [https://logbooks.jlab.org/entry/4093102 MCC created a new energy lock for us]
 +
* No maintenance on the MCC schedule. Halls A&C coming online later today (pm - swing).
 +
 +
=== Issues ===
 +
*[https://logbooks.jlab.org/entry/4093150 FCAL hotspot swamping the daq] 7:30am
 +
*[https://logbooks.jlab.org/entry/4093148 BCAL dead channel] 7:30am
 +
*[https://logbooks.jlab.org/entry/4093090 Another FDC fadc roc 62 slot 8]
 +
*[https://logbooks.jlab.org/entry/4093152 FDC occupancy gap]
 +
 +
=== The plan ===
 +
* Consider filling the target later today
 +
 +
=== Shift Summaries ===
 +
 +
*[https://logbooks.jlab.org/entry/4092886 Tues 29 Nov early riser]
 +
*[https://logbooks.jlab.org/entry/4092972 Tues 29 Nov day]
 +
*[https://logbooks.jlab.org/entry/4093077 Tues 29 Nov swing]
 +
*[https://logbooks.jlab.org/entry/4093101 Tues 29 Nov owl]
 +
*[https://logbooks.jlab.org/entry/4093128 Wed 30 Nov early riser]
 +
 +
= Tuesday Nov 29 =
 +
 +
=== Updates from the last 24h ===
 +
* Emptied the target on Monday morning.
 +
* Smooth running until 6am this morning BCAL fadc problems [https://logbooks.jlab.org/entry/4092925 excluded from daq]
 +
* No maintenance scheduled from MCC.  HA down until estimated 9pm tonight, HB down, HC reconfiguring until tomorrow swing. The cavity with 0 field will be brought back online today.
 +
 +
=== Issues ===
 +
* Rootspy died. (Sergey fixed it)
 +
* [https://logbooks.jlab.org/entry/4090130 Reconstructed Beam Energy monitoring plot discrepancy in recent runs] (Drew)
 +
* [https://logbooks.jlab.org/entry/4092919 Beam energy (Alexandre)] [https://logbooks.jlab.org/files/2022/11/4092881/plot_13.png chart (Eugene)]  Jay said yes this will settle down when the other halls come online again
 +
* Run 111666 [https://logbooks.jlab.org/entry/4092900 Trigger bit 1 histo empty]
 +
* Run 111666 [https://logbooks.jlab.org/entry/4092902 BCAL bad fadc][https://logbooks.jlab.org/files/2022/11/4092897/rs_page01.png hot stripe] [https://logbooks.jlab.org/files/2022/11/4092897/rs_page07.png dead cell 510ish]
 +
* [https://logbooks.jlab.org/entry/4092911 FDC fadc issue with raw mode readout from roc 53]
 +
 +
=== The plan ===
 +
* Make an access to replace the 2 bad fadcs - BCAL N1-3-MID slot 4 and ROCFDC3 (rocid 53) slot 10.
 +
* Continue production running at 200nA with empty target until further notice. 1.2B triggers as of Tues 7:30am
 +
 +
=== Shift Summaries ===
 +
*[https://logbooks.jlab.org/entry/4092446 Mon 28 Nov early riser]
 +
*[https://logbooks.jlab.org/entry/4092561 Mon 28 Nov day]
 +
*[https://logbooks.jlab.org/entry/4092755 Mon 28 Nov swing]
 +
*[https://logbooks.jlab.org/entry/4092853 Mon 28 Nov owl]
 +
*[https://logbooks.jlab.org/entry/4092886 Tues 29 Nov early riser][https://logbooks.jlab.org/entry/4093134 early riser 2]
  
 
= Monday Nov 28 =
 
= Monday Nov 28 =
Line 13: Line 70:
 
=== The plan ===
 
=== The plan ===
 
* Continue production running at 200nA with a full target until Monday daytime
 
* Continue production running at 200nA with a full target until Monday daytime
 +
* Plans from MCC: A off for 24h, B down, C doing target change until Wed swing probably
 
* '''[https://logbooks.jlab.org/entry/4091493 Note that MCC will be doing operator training during owl shifts until Dec 2]'''
 
* '''[https://logbooks.jlab.org/entry/4091493 Note that MCC will be doing operator training during owl shifts until Dec 2]'''
  
 
=== Achievements ===
 
=== Achievements ===
  
* Production running with full target, 10.3B triggers as of Saturday 10pm
+
* Production running with full target, 15B triggers this cycle (Monday 8am)
 
* Filled the target on Wednesday morning after approximately 2B triggers with empty target.
 
* Filled the target on Wednesday morning after approximately 2B triggers with empty target.
 
* Raw mode cosmics run 111571 (Beni)  
 
* Raw mode cosmics run 111571 (Beni)  
 
* [https://logbooks.jlab.org/entry/4089926 FCAL base changed] (Malte)
 
* [https://logbooks.jlab.org/entry/4089926 FCAL base changed] (Malte)
 
* Several locked up FCAL bases reset [https://logbooks.jlab.org/entry/4089634 Wed early riser] [https://logbooks.jlab.org/entry/4089921 Wed day] [https://logbooks.jlab.org/entry/4090766 Fri early riser]
 
* Several locked up FCAL bases reset [https://logbooks.jlab.org/entry/4089634 Wed early riser] [https://logbooks.jlab.org/entry/4089921 Wed day] [https://logbooks.jlab.org/entry/4090766 Fri early riser]
 +
* The top alcohol bubbler has been filled.
 +
* The empty Ar cylinder has been swapped out.
  
 
=== Issues ===
 
=== Issues ===
* [https://logbooks.jlab.org/entry/4092466 CCAL plot gaps & alpha trigger]  
+
* [https://logbooks.jlab.org/entry/4092466 CCAL alpha trigger missing since 111646] from HistMacro_Trigger_PrimEx
* The top alcohol bubbler is approaching the Add line.
+
* [https://logbooks.jlab.org/entry/4090024 One Ar cylinder is empty]
+
 
* [https://logbooks.jlab.org/entry/4090130 Reconstructed Beam Energy monitoring plot discrepancy in recent runs] (Drew)
 
* [https://logbooks.jlab.org/entry/4090130 Reconstructed Beam Energy monitoring plot discrepancy in recent runs] (Drew)
 
* No beam for ~2h Saturday with [https://logbooks.jlab.org/entry/4091621 vacuum issue], ~1h with [https://logbooks.jlab.org/entry/4091908 trips] in swing shift. Also see the drama section.
 
* No beam for ~2h Saturday with [https://logbooks.jlab.org/entry/4091621 vacuum issue], ~1h with [https://logbooks.jlab.org/entry/4091908 trips] in swing shift. Also see the drama section.
* The CH kitchen light switches off automatically but does not switch on automatically, is it supposed to? Better to switch it off on exit.
+
* The CH kitchen light switches off automatically but does not switch on automatically, is it supposed to? Better to switch it off on exit. Aha, the sensor is in the entrance foyer between the 2 sets of doors.
  
 
=== Drama (closed issues) ===
 
=== Drama (closed issues) ===
Line 47: Line 105:
 
*[https://logbooks.jlab.org/entry/4090766 Fri 25 Nov early riser]
 
*[https://logbooks.jlab.org/entry/4090766 Fri 25 Nov early riser]
 
*[https://logbooks.jlab.org/entry/4091164 Fri 25 Nov swing] [https://logbooks.jlab.org/entry/4091149 swing 2]
 
*[https://logbooks.jlab.org/entry/4091164 Fri 25 Nov swing] [https://logbooks.jlab.org/entry/4091149 swing 2]
*[https://logbooks.jlab.org/entry/4091325 Fri 23 Nov owl] [https://logbooks.jlab.org/entry/4091423 owl 2]
+
*[https://logbooks.jlab.org/entry/4091325 Fri 25 Nov owl] [https://logbooks.jlab.org/entry/4091423 owl 2]
*[https://logbooks.jlab.org/entry/4091517 Sat 24 Nov early riser]
+
*[https://logbooks.jlab.org/entry/4091517 Sat 26 Nov early riser]
*[https://logbooks.jlab.org/entry/4091589 Sat 24 Nov day]  
+
*[https://logbooks.jlab.org/entry/4091589 Sat 26 Nov day]  
*[https://logbooks.jlab.org/entry/4091768 Sat 24 Nov swing][https://logbooks.jlab.org/entry/4091743 swing 2]
+
*[https://logbooks.jlab.org/entry/4091768 Sat 26 Nov swing][https://logbooks.jlab.org/entry/4091743 swing 2]
*[https://logbooks.jlab.org/entry/4091937 Sat 24 Nov owl][https://logbooks.jlab.org/entry/4091994 owl 2]
+
*[https://logbooks.jlab.org/entry/4091937 Sat 26 Nov owl][https://logbooks.jlab.org/entry/4091994 owl 2]
*[https://logbooks.jlab.org/entry/4092056 Sun 25 Nov early riser]
+
*[https://logbooks.jlab.org/entry/4092056 Sun 27 Nov early riser]
*[https://logbooks.jlab.org/entry/4092149 Sun 25 Nov day]
+
*[https://logbooks.jlab.org/entry/4092149 Sun 27 Nov day]
*[https://logbooks.jlab.org/entry/4092253 Sun 25 Nov swing]
+
*[https://logbooks.jlab.org/entry/4092253 Sun 27 Nov swing]
*[https://logbooks.jlab.org/entry/4092362 Sun 25 Nov owl]
+
*[https://logbooks.jlab.org/entry/4092362 Sun 27 Nov owl]

Latest revision as of 15:15, 30 November 2022

Meetings are via ZoomGov: connect (Meeting ID: 160 199 0060 / Passcode 8394)

MCC whiteboard

Hall D counting room white board

Hall D Logbook

Back to Run Coordination Meetings:Fall2022


Wednesday Nov 30

Since the morning meeting

Updates from the last 24h

Issues

The plan

  • Consider filling the target later today

Shift Summaries

Tuesday Nov 29

Updates from the last 24h

  • Emptied the target on Monday morning.
  • Smooth running until 6am this morning BCAL fadc problems excluded from daq
  • No maintenance scheduled from MCC. HA down until estimated 9pm tonight, HB down, HC reconfiguring until tomorrow swing. The cavity with 0 field will be brought back online today.

Issues

The plan

  • Make an access to replace the 2 bad fadcs - BCAL N1-3-MID slot 4 and ROCFDC3 (rocid 53) slot 10.
  • Continue production running at 200nA with empty target until further notice. 1.2B triggers as of Tues 7:30am

Shift Summaries

Monday Nov 28

The plan

Achievements

  • Production running with full target, 15B triggers this cycle (Monday 8am)
  • Filled the target on Wednesday morning after approximately 2B triggers with empty target.
  • Raw mode cosmics run 111571 (Beni)
  • FCAL base changed (Malte)
  • Several locked up FCAL bases reset Wed early riser Wed day Fri early riser
  • The top alcohol bubbler has been filled.
  • The empty Ar cylinder has been swapped out.

Issues

Drama (closed issues)

  • Wednesday pm - cooling water outage summary and more stripcharts. We lost about 2h beam-time time fixing problems and waiting for the target to refill; it was another 2h before the BCAL chiller temps returned to normal.
  • Monday 1am - NFS disk errors caused multiple DAQ problems. Sergey was called in.
  • Monday 2:30am CCAL HV unit D2-8_MID lost communication, reported 0 V restored after access to reboot

Shift Summaries