Difference between revisions of "Run Planning Meeting Notes, November 24 - November 30, 2022"

From GlueXWiki
Jump to: navigation, search
(Issues)
(Since the morning meeting)
 
(26 intermediate revisions by the same user not shown)
Line 9: Line 9:
 
Back to [[Run Coordination Meetings:Fall2022]]
 
Back to [[Run Coordination Meetings:Fall2022]]
  
= Tuesday Nov 29 =
 
  
=== The plan ===
+
= Wednesday Nov 30 =
* Continue production running at 200nA with a empty target until further notice, most probably on Wednesday.  
+
=== Since the morning meeting ===
* Take production data in raw mode IF Lubomir requests it.  
+
* [https://logbooks.jlab.org/entry/4093179 fa125 replaced for FDC]
 +
* [https://logbooks.jlab.org/entry/4093177 fa250 replaced for FCAL]
 +
* Filled the target
 +
* 11am update from Igal: 2.2B triggers for empty target, 15.4B triggers for full
  
 
=== Updates from the last 24h ===
 
=== Updates from the last 24h ===
 +
* [https://logbooks.jlab.org/entry/4092964 FDC fadc replaced]
 +
* [https://logbooks.jlab.org/entry/4093042 BCAL fadc replaced]
 +
* [https://logbooks.jlab.org/entry/4093102 MCC created a new energy lock for us]
 +
* No maintenance on the MCC schedule. Halls A&C coming online later today (pm - swing).
  
 +
=== Issues ===
 +
*[https://logbooks.jlab.org/entry/4093150 FCAL hotspot swamping the daq] 7:30am
 +
*[https://logbooks.jlab.org/entry/4093148 BCAL dead channel] 7:30am
 +
*[https://logbooks.jlab.org/entry/4093090 Another FDC fadc roc 62 slot 8]
 +
*[https://logbooks.jlab.org/entry/4093152 FDC occupancy gap]
 +
 +
=== The plan ===
 +
* Consider filling the target later today
 +
 +
=== Shift Summaries ===
 +
 +
*[https://logbooks.jlab.org/entry/4092886 Tues 29 Nov early riser]
 +
*[https://logbooks.jlab.org/entry/4092972 Tues 29 Nov day]
 +
*[https://logbooks.jlab.org/entry/4093077 Tues 29 Nov swing]
 +
*[https://logbooks.jlab.org/entry/4093101 Tues 29 Nov owl]
 +
*[https://logbooks.jlab.org/entry/4093128 Wed 30 Nov early riser]
 +
 +
= Tuesday Nov 29 =
 +
 +
=== Updates from the last 24h ===
 
* Emptied the target on Monday morning.
 
* Emptied the target on Monday morning.
 +
* Smooth running until 6am this morning BCAL fadc problems [https://logbooks.jlab.org/entry/4092925 excluded from daq]
 +
* No maintenance scheduled from MCC.  HA down until estimated 9pm tonight, HB down, HC reconfiguring until tomorrow swing. The cavity with 0 field will be brought back online today.
  
 
=== Issues ===
 
=== Issues ===
 +
* Rootspy died. (Sergey fixed it)
 +
* [https://logbooks.jlab.org/entry/4090130 Reconstructed Beam Energy monitoring plot discrepancy in recent runs] (Drew)
 +
* [https://logbooks.jlab.org/entry/4092919 Beam energy (Alexandre)] [https://logbooks.jlab.org/files/2022/11/4092881/plot_13.png chart (Eugene)]  Jay said yes this will settle down when the other halls come online again
 
* Run 111666 [https://logbooks.jlab.org/entry/4092900 Trigger bit 1 histo empty]
 
* Run 111666 [https://logbooks.jlab.org/entry/4092900 Trigger bit 1 histo empty]
 
* Run 111666 [https://logbooks.jlab.org/entry/4092902 BCAL bad fadc][https://logbooks.jlab.org/files/2022/11/4092897/rs_page01.png hot stripe] [https://logbooks.jlab.org/files/2022/11/4092897/rs_page07.png dead cell 510ish]
 
* Run 111666 [https://logbooks.jlab.org/entry/4092902 BCAL bad fadc][https://logbooks.jlab.org/files/2022/11/4092897/rs_page01.png hot stripe] [https://logbooks.jlab.org/files/2022/11/4092897/rs_page07.png dead cell 510ish]
* [https://logbooks.jlab.org/entry/4090130 Reconstructed Beam Energy monitoring plot discrepancy in recent runs] (Drew)
+
* [https://logbooks.jlab.org/entry/4092911 FDC fadc issue with raw mode readout from roc 53]
* [https://logbooks.jlab.org/entry/4092911 FDC fadc issue with raw mode readout from roc 53] is that slot 10?
+
 
* [https://logbooks.jlab.org/entry/4092919 Beam energy (Alexandre)] [https://logbooks.jlab.org/files/2022/11/4092881/plot_13.png chart (Eugene)]
+
=== The plan ===
 +
* Make an access to replace the 2 bad fadcs - BCAL N1-3-MID slot 4 and ROCFDC3 (rocid 53) slot 10.
 +
* Continue production running at 200nA with empty target until further notice. 1.2B triggers as of Tues 7:30am
  
 
=== Shift Summaries ===
 
=== Shift Summaries ===
Line 31: Line 64:
 
*[https://logbooks.jlab.org/entry/4092755 Mon 28 Nov swing]
 
*[https://logbooks.jlab.org/entry/4092755 Mon 28 Nov swing]
 
*[https://logbooks.jlab.org/entry/4092853 Mon 28 Nov owl]
 
*[https://logbooks.jlab.org/entry/4092853 Mon 28 Nov owl]
*[https://logbooks.jlab.org/entry/4092886 Tues 29 Nov day]
+
*[https://logbooks.jlab.org/entry/4092886 Tues 29 Nov early riser][https://logbooks.jlab.org/entry/4093134 early riser 2]
  
 
= Monday Nov 28 =
 
= Monday Nov 28 =

Latest revision as of 15:15, 30 November 2022

Meetings are via ZoomGov: connect (Meeting ID: 160 199 0060 / Passcode 8394)

MCC whiteboard

Hall D counting room white board

Hall D Logbook

Back to Run Coordination Meetings:Fall2022


Wednesday Nov 30

Since the morning meeting

Updates from the last 24h

Issues

The plan

  • Consider filling the target later today

Shift Summaries

Tuesday Nov 29

Updates from the last 24h

  • Emptied the target on Monday morning.
  • Smooth running until 6am this morning BCAL fadc problems excluded from daq
  • No maintenance scheduled from MCC. HA down until estimated 9pm tonight, HB down, HC reconfiguring until tomorrow swing. The cavity with 0 field will be brought back online today.

Issues

The plan

  • Make an access to replace the 2 bad fadcs - BCAL N1-3-MID slot 4 and ROCFDC3 (rocid 53) slot 10.
  • Continue production running at 200nA with empty target until further notice. 1.2B triggers as of Tues 7:30am

Shift Summaries

Monday Nov 28

The plan

Achievements

  • Production running with full target, 15B triggers this cycle (Monday 8am)
  • Filled the target on Wednesday morning after approximately 2B triggers with empty target.
  • Raw mode cosmics run 111571 (Beni)
  • FCAL base changed (Malte)
  • Several locked up FCAL bases reset Wed early riser Wed day Fri early riser
  • The top alcohol bubbler has been filled.
  • The empty Ar cylinder has been swapped out.

Issues

Drama (closed issues)

  • Wednesday pm - cooling water outage summary and more stripcharts. We lost about 2h beam-time time fixing problems and waiting for the target to refill; it was another 2h before the BCAL chiller temps returned to normal.
  • Monday 1am - NFS disk errors caused multiple DAQ problems. Sergey was called in.
  • Monday 2:30am CCAL HV unit D2-8_MID lost communication, reported 0 V restored after access to reboot

Shift Summaries