* [https://logbooks.jlab.org/entry/4090130 Reconstructed Beam Energy monitoring plot discrepancy in recent runs] (Drew)
 
* [https://logbooks.jlab.org/entry/4090130 Reconstructed Beam Energy monitoring plot discrepancy in recent runs] (Drew)
 
* No beam for ~2h Saturday with [https://logbooks.jlab.org/entry/4091621 vacuum issue], ~1h with [https://logbooks.jlab.org/entry/4091908 trips] in swing shift. Also see the drama section.
 
* No beam for ~2h Saturday with [https://logbooks.jlab.org/entry/4091621 vacuum issue], ~1h with [https://logbooks.jlab.org/entry/4091908 trips] in swing shift. Also see the drama section.
* The CH kitchen light switches off automatically but does not switch on automatically, is it supposed to? Better to switch it off on exit.
+
* The CH kitchen light switches off automatically but does not switch on automatically, is it supposed to? Better to switch it off on exit. Aha, the sensor is in the entrance foyer between the 2 sets of doors.
  
 
=== Drama (closed issues) ===
 
=== Drama (closed issues) ===

Revision as of 09:33, 28 November 2022

Meetings are via ZoomGov: connect (Meeting ID: 160 199 0060 / Passcode 8394)

MCC whiteboard

Hall D counting room white board

Hall D Logbook

Back to Run Coordination Meetings:Fall2022

Monday Nov 28

The plan

Achievements

  • Production running with full target, 15B triggers this cycle (Monday 8am)
  • Filled the target on Wednesday morning after approximately 2B triggers with empty target.
  • Raw mode cosmics run 111571 (Beni)
  • FCAL base changed (Malte)
  • Several locked up FCAL bases reset Wed early riser Wed day Fri early riser

Issues

Drama (closed issues)

  • Wednesday pm - cooling water outage summary and more stripcharts. We lost about 2h beam-time time fixing problems and waiting for the target to refill; it was another 2h before the BCAL chiller temps returned to normal.
  • Monday 1am - NFS disk errors caused multiple DAQ problems. Sergey was called in.
  • Monday 2:30am CCAL HV unit D2-8_MID lost communication, reported 0 V restored after access to reboot