* Run 111666 [https://logbooks.jlab.org/entry/4092900 Trigger bit 1 histo empty]
 
* Run 111666 [https://logbooks.jlab.org/files/2022/11/4092897/rs_page01.png BCAL hot stripe] [https://logbooks.jlab.org/files/2022/11/4092897/rs_page07.png BCAL dead cell 510ish]
 
* Run 111666 [https://logbooks.jlab.org/files/2022/11/4092897/rs_page01.png BCAL hot stripe] [https://logbooks.jlab.org/files/2022/11/4092897/rs_page07.png BCAL dead cell 510ish]
 
* [https://logbooks.jlab.org/entry/4090130 Reconstructed Beam Energy monitoring plot discrepancy in recent runs] (Drew)
 
* [https://logbooks.jlab.org/entry/4090130 Reconstructed Beam Energy monitoring plot discrepancy in recent runs] (Drew)

Revision as of 07:36, 29 November 2022

Meetings are via ZoomGov: connect (Meeting ID: 160 199 0060 / Passcode 8394)

MCC whiteboard

Hall D counting room white board

Hall D Logbook

Back to Run Coordination Meetings:Fall2022

Tuesday Nov 29

The plan

  • Continue production running at 200nA with a empty target until further notice, most probably on Wednesday.
  • Take production data in raw mode IF Lubomir requests it.

Updates from the last 24h

  • Emptied the target on Monday morning.

Issues

Shift Summaries

Monday Nov 28

The plan

Achievements

  • Production running with full target, 15B triggers this cycle (Monday 8am)
  • Filled the target on Wednesday morning after approximately 2B triggers with empty target.
  • Raw mode cosmics run 111571 (Beni)
  • FCAL base changed (Malte)
  • Several locked up FCAL bases reset Wed early riser Wed day Fri early riser
  • The top alcohol bubbler has been filled.
  • The empty Ar cylinder has been swapped out.

Issues

Drama (closed issues)

  • Wednesday pm - cooling water outage summary and more stripcharts. We lost about 2h beam-time time fixing problems and waiting for the target to refill; it was another 2h before the BCAL chiller temps returned to normal.
  • Monday 1am - NFS disk errors caused multiple DAQ problems. Sergey was called in.
  • Monday 2:30am CCAL HV unit D2-8_MID lost communication, reported 0 V restored after access to reboot