Difference between revisions of "Run Planning Meeting Notes, November 25 - December 1, 2021"

From GlueXWiki
Jump to: navigation, search
(Created page with "=Thursday November 25= #Last 24h: #Issues: # [https://halldweb.jlab.org/wiki/index.php/SRC/CT_Run_Plan Plan:] # Analysis update")
 
(Thursday November 25)
Line 1: Line 1:
 
=Thursday November 25=
 
=Thursday November 25=
 
#Last 24h:
 
#Last 24h:
 +
 +
#* Solenoid ramped down, cryotarget removed and replaced with the carbon foils (work finished ~12:00)
 +
#* Beni started to ramp up the solenoid. ~19:00 tune beam was delivered into the hall. After harp scans and finishing with the solenoid ramp up, DAQ was prepared for production.
 +
#* First Carbon run at 150nA started ~11:30
  
 
#Issues:
 
#Issues:
 +
#* DAQ computer was frozen during the afternoon, so a hot reboot was necessary. That could cause some communications issues with some racks, especially with the Pair Spectrometer.
 +
#* Besides that issue, I suggest limiting the DAQ computer just for CODA. I had the experience that the computer gets freeze or lose the GUI when is used with other apps.
  
 
# [https://halldweb.jlab.org/wiki/index.php/SRC/CT_Run_Plan Plan:]  
 
# [https://halldweb.jlab.org/wiki/index.php/SRC/CT_Run_Plan Plan:]  
 +
 +
#* run on carbon at 150nA´
 +
#* Rotate the radiators and use both configurations
 +
##* It was suggested to stop the beam ALWAYS before changing the radiator configuration (even with the same radiator)
 +
#* Take at least two amorphous runs
  
 
# Analysis update
 
# Analysis update

Revision as of 10:55, 25 November 2021

Thursday November 25

  1. Last 24h:
    • Solenoid ramped down, cryotarget removed and replaced with the carbon foils (work finished ~12:00)
    • Beni started to ramp up the solenoid. ~19:00 tune beam was delivered into the hall. After harp scans and finishing with the solenoid ramp up, DAQ was prepared for production.
    • First Carbon run at 150nA started ~11:30
  1. Issues:
    • DAQ computer was frozen during the afternoon, so a hot reboot was necessary. That could cause some communications issues with some racks, especially with the Pair Spectrometer.
    • Besides that issue, I suggest limiting the DAQ computer just for CODA. I had the experience that the computer gets freeze or lose the GUI when is used with other apps.
  1. Plan:
    • run on carbon at 150nA´
    • Rotate the radiators and use both configurations
      • It was suggested to stop the beam ALWAYS before changing the radiator configuration (even with the same radiator)
    • Take at least two amorphous runs
  1. Analysis update