+ | =Friday November 26= | ||
+ | #Last 24h: | ||
+ | |||
+ | #* Production has been quite good. | ||
+ | |||
+ | #Issues: | ||
+ | |||
+ | #* ~23:30 VESDA Fire Alarm panel started to beep, but not alarm was present. Sasha explained us how to proceed, and around one hour later it was solved. | ||
+ | |||
+ | # [https://halldweb.jlab.org/wiki/index.php/SRC/CT_Run_Plan Plan:] | ||
+ | #* run on carbon at 150nA´ | ||
+ | #* Rotate the radiators and use both configurations | ||
+ | ##* It was suggested to stop the beam ALWAYS before changing the radiator configuration (even with the same radiator). Between radiator change (0/90 -> 35/145 ALWAYS ask MCC to set the dumplette) | ||
+ | #* Take ONE amorphous run. | ||
+ | |||
=Thursday November 25= | =Thursday November 25= | ||
#Last 24h: | #Last 24h: | ||
Line 15: | Line 30: | ||
#* run on carbon at 150nA´ | #* run on carbon at 150nA´ | ||
#* Rotate the radiators and use both configurations | #* Rotate the radiators and use both configurations | ||
− | ##* It was suggested to stop the beam ALWAYS before changing the radiator configuration (even with the same radiator). Between radiator change (0/90 -> 35/145 ALWAYS ask MCC to set the | + | ##* It was suggested to stop the beam ALWAYS before changing the radiator configuration (even with the same radiator). Between radiator change (0/90 -> 35/145 ALWAYS ask MCC to set the dumplette) |
#* Take at least two amorphous runs | #* Take at least two amorphous runs | ||
# Analysis update | # Analysis update |
Revision as of 13:05, 26 November 2021
Friday November 26
- Last 24h:
- Production has been quite good.
- Issues:
- ~23:30 VESDA Fire Alarm panel started to beep, but not alarm was present. Sasha explained us how to proceed, and around one hour later it was solved.
- Plan:
- run on carbon at 150nA´
- Rotate the radiators and use both configurations
- It was suggested to stop the beam ALWAYS before changing the radiator configuration (even with the same radiator). Between radiator change (0/90 -> 35/145 ALWAYS ask MCC to set the dumplette)
- Take ONE amorphous run.
Thursday November 25
- Last 24h:
- Solenoid ramped down, cryotarget removed and replaced with the carbon foils (work finished ~12:00)
- Beni started to ramp up the solenoid. ~19:00 tune beam was delivered into the hall. After harp scans and finishing with the solenoid ramp up, DAQ was prepared for production.
- First Carbon run at 150nA started ~11:30
- Issues:
- DAQ computer was frozen during the afternoon, so a hot reboot was necessary. That could cause some communications issues with some racks, especially with the Pair Spectrometer.
- Besides that issue, I suggest limiting the DAQ computer just for CODA. I had the experience that the computer gets freeze or lose the GUI when is used with other apps.
- Not an experimental issue, but important, the mouse from the conference room has disappear.
- run on carbon at 150nA´
- Rotate the radiators and use both configurations
- It was suggested to stop the beam ALWAYS before changing the radiator configuration (even with the same radiator). Between radiator change (0/90 -> 35/145 ALWAYS ask MCC to set the dumplette)
- Take at least two amorphous runs
- Analysis update