=Sunday November 28=
 
=Sunday November 28=
 
#Last 24h:
 
#Last 24h:
 
 
#* Production has been quite good.  
 
#* Production has been quite good.  
 
 
#Issues:
 
#Issues:
 
 
#* No major issues to report.
 
#* No major issues to report.
 
#* The energy oscillations reported by Alexandre [https://logbooks.jlab.org/entry/3950833 here] and [https://logbooks.jlab.org/entry/3951413  here] were addressed by [https://logbooks.jlab.org/entry/3951960 Jay] this morning. I lack the enough knowledge to arrive at a conclusion, but it is apparent that it is not affecting the quality of the data.  
 
#* The energy oscillations reported by Alexandre [https://logbooks.jlab.org/entry/3950833 here] and [https://logbooks.jlab.org/entry/3951413  here] were addressed by [https://logbooks.jlab.org/entry/3951960 Jay] this morning. I lack the enough knowledge to arrive at a conclusion, but it is apparent that it is not affecting the quality of the data.  
 
 
# [https://halldweb.jlab.org/wiki/index.php/SRC/CT_Run_Plan Plan:]
 
# [https://halldweb.jlab.org/wiki/index.php/SRC/CT_Run_Plan Plan:]
 
#* run on carbon at 150nA´
 
#* run on carbon at 150nA´
Line 18: Line 14:
 
=Saturday November 27=
 
=Saturday November 27=
 
#Last 24h:
 
#Last 24h:
 
 
#* Production has been quite good.  
 
#* Production has been quite good.  
 
 
#Issues:
 
#Issues:
 
 
#* No major issues to report.
 
#* No major issues to report.
 
 
# [https://halldweb.jlab.org/wiki/index.php/SRC/CT_Run_Plan Plan:]
 
# [https://halldweb.jlab.org/wiki/index.php/SRC/CT_Run_Plan Plan:]
 
#* run on carbon at 150nA´
 
#* run on carbon at 150nA´
Line 33: Line 25:
 
=Friday November 26=
 
=Friday November 26=
 
#Last 24h:
 
#Last 24h:
 
 
#* Production has been quite good.  
 
#* Production has been quite good.  
 
 
#Issues:
 
#Issues:
 
 
#* ~23:30 VESDA Fire Alarm panel started to beep, but not alarm was present. Sasha explained us how to proceed, and around one hour later it was solved.  
 
#* ~23:30 VESDA Fire Alarm panel started to beep, but not alarm was present. Sasha explained us how to proceed, and around one hour later it was solved.  
 
 
# [https://halldweb.jlab.org/wiki/index.php/SRC/CT_Run_Plan Plan:]
 
# [https://halldweb.jlab.org/wiki/index.php/SRC/CT_Run_Plan Plan:]
 
#* run on carbon at 150nA´
 
#* run on carbon at 150nA´
Line 48: Line 36:
 
=Thursday November 25=
 
=Thursday November 25=
 
#Last 24h:
 
#Last 24h:
 
 
#* Solenoid ramped down, cryotarget removed and replaced with the carbon foils (work finished ~12:00)
 
#* Solenoid ramped down, cryotarget removed and replaced with the carbon foils (work finished ~12:00)
 
#* Beni started to ramp up the solenoid. ~19:00 tune beam was delivered into the hall. After harp scans and finishing with the solenoid ramp up, DAQ was prepared for production.
 
#* Beni started to ramp up the solenoid. ~19:00 tune beam was delivered into the hall. After harp scans and finishing with the solenoid ramp up, DAQ was prepared for production.
 
#* First Carbon run at 150nA started ~11:30
 
#* First Carbon run at 150nA started ~11:30
 
 
#Issues:
 
#Issues:
 
#* DAQ computer was frozen during the afternoon, so a hot reboot was necessary. That could cause some communications issues with some racks, especially with the Pair Spectrometer.  
 
#* DAQ computer was frozen during the afternoon, so a hot reboot was necessary. That could cause some communications issues with some racks, especially with the Pair Spectrometer.  
 
#* Besides that issue, I suggest limiting the DAQ computer just for CODA. I had the experience that the computer gets freeze or lose the GUI when is used with other apps.  
 
#* Besides that issue, I suggest limiting the DAQ computer just for CODA. I had the experience that the computer gets freeze or lose the GUI when is used with other apps.  
 
#* Not an experimental issue, but important, the mouse from the conference room has disappear.  
 
#* Not an experimental issue, but important, the mouse from the conference room has disappear.  
 
 
# [https://halldweb.jlab.org/wiki/index.php/SRC/CT_Run_Plan Plan:]  
 
# [https://halldweb.jlab.org/wiki/index.php/SRC/CT_Run_Plan Plan:]  
 
 
#* run on carbon at 150nA´
 
#* run on carbon at 150nA´
 
#* Rotate the radiators and use both configurations
 
#* Rotate the radiators and use both configurations

Revision as of 22:20, 28 November 2021

Sunday November 28

  1. Last 24h:
    • Production has been quite good.
  2. Issues:
    • No major issues to report.
    • The energy oscillations reported by Alexandre here and here were addressed by Jay this morning. I lack the enough knowledge to arrive at a conclusion, but it is apparent that it is not affecting the quality of the data.
  3. Plan:
    • run on carbon at 150nA´
    • Rotate the radiators and use both configurations
      • It was suggested to stop the beam ALWAYS before changing the radiator configuration (even with the same radiator). Between radiator change (0/90 <--> 35/145 ALWAYS ask MCC to set the dumplette)


Saturday November 27

  1. Last 24h:
    • Production has been quite good.
  2. Issues:
    • No major issues to report.
  3. Plan:
    • run on carbon at 150nA´
    • Rotate the radiators and use both configurations
      • It was suggested to stop the beam ALWAYS before changing the radiator configuration (even with the same radiator). Between radiator change (0/90 <--> 35/145 ALWAYS ask MCC to set the dumplette)


Friday November 26

  1. Last 24h:
    • Production has been quite good.
  2. Issues:
    • ~23:30 VESDA Fire Alarm panel started to beep, but not alarm was present. Sasha explained us how to proceed, and around one hour later it was solved.
  3. Plan:
    • run on carbon at 150nA´
    • Rotate the radiators and use both configurations
      • It was suggested to stop the beam ALWAYS before changing the radiator configuration (even with the same radiator). Between radiator change (0/90 <--> 35/145 ALWAYS ask MCC to set the dumplette)
    • Take ONE amorphous run.

Thursday November 25

  1. Last 24h:
    • Solenoid ramped down, cryotarget removed and replaced with the carbon foils (work finished ~12:00)
    • Beni started to ramp up the solenoid. ~19:00 tune beam was delivered into the hall. After harp scans and finishing with the solenoid ramp up, DAQ was prepared for production.
    • First Carbon run at 150nA started ~11:30
  2. Issues:
    • DAQ computer was frozen during the afternoon, so a hot reboot was necessary. That could cause some communications issues with some racks, especially with the Pair Spectrometer.
    • Besides that issue, I suggest limiting the DAQ computer just for CODA. I had the experience that the computer gets freeze or lose the GUI when is used with other apps.
    • Not an experimental issue, but important, the mouse from the conference room has disappear.
  3. Plan:
    • run on carbon at 150nA´
    • Rotate the radiators and use both configurations
      • It was suggested to stop the beam ALWAYS before changing the radiator configuration (even with the same radiator). Between radiator change (0/90 -> 35/145 ALWAYS ask MCC to set the dumplette)
    • Take at least two amorphous runs
  1. Analysis update