Sep 22, 2011 SiPM Electrical and Cooling

From GlueXWiki
Revision as of 16:36, 15 September 2011 by Elton (Talk | contribs) (Action Items from previous meetings)

Jump to: navigation, search

Action Items from previous meetings

  1. Carl to check instability of LED (as a possible contributor to sensor output changes) (Carl)
  2. Bias/temperature compensation review: Tentatively set for Oct 13 because Fernando will be out of the country till October and October 6 is the collaboration meeting.
  3. Fernando to provide dxf file to Jim, who has had trouble reading his stp files.

Tentative Agenda

  1. Announcements
  2. Action Items
  3. Schedule, reporting, and manpower (Elton)
  4. SiPM testing (everyone)
    1. Light source / optics
    2. Electronic boards
    3. Cabling
    4. Cooling plate
    5. Other?
  5. Discussion of Hamamatsu visit tomorrow
  6. Mechanical (Jim)
  7. Mechanical drawings (Chuck)
  8. Geometry (Elton)
  9. Temperature compensation (Jack)
  10. Preamp-summing (Fernando)
  11. Granularity (Elton)

Minutes

Attending: