Difference between revisions of "Sep 30, 2010 Calorimetry"

From GlueXWiki
Jump to: navigation, search
(Tentative Agenda)
(Items for followup from previous meeting(s))
Line 13: Line 13:
 
# Monitoring
 
# Monitoring
 
# Fcal
 
# Fcal
#* Tim to check on magnetic checks of non-corrosion coated shield.
+
#* <strike> Tim to check on magnetic checks of non-corrosion coated shield. </strike>  Measurements completed. Ti
 
# SiPM decision
 
# SiPM decision
 
#* IU: geometry for summed units
 
#* IU: geometry for summed units

Revision as of 12:12, 30 September 2010

Teleconference Time: 11:00 a.m. EDT

  • ESNET and EVO session
  • Phone in CC F326 is 757-269-6337
  • Phone in the Regina Videoconference Suite is 306-585-4204
  • Phone only if requested:
    • +1-800-377-8846 : US
    • +1-888-276-7715 : Canada
    • +1-302-709-8424 : International
    • then enter participant code: 77438230# (remember the "#"). Phone line by request only.

Items for followup from previous meeting(s)

  1. Monitoring
  2. Fcal
    • Tim to check on magnetic checks of non-corrosion coated shield. Measurements completed. Ti
  3. SiPM decision
    • IU: geometry for summed units
    • JLab: Complete testing of radiation damage to sensors, temperature dependence, etc.

Tentative Agenda

  1. Calibration (Athens)
  2. Announcements
    • Change of meeting time?
  3. Review of Action Items
  4. FCAL
    1. (Update from Matt): There are no major updates from the FCAL. We were assembling the final batch of CW prototypes, but I have not yet heard whether they are all together and working.
  5. BCAL
    1. Construction Status
  6. SiPM update
  7. Simulations
  8. Other Updates

Minutes

Attendees: