September 11, 2013 tracking CDC/FDC

From GlueXWiki
Revision as of 13:12, 11 September 2013 by Nsjarvis (Talk | contribs) (Minutes)

Jump to: navigation, search

Meeting Time and Place

Wednesday September 11, 2013 at 11:00am At Jefferson Lab, the meeting will be held in F326

Connections

To connect from the outside, please use ESNET

  1. ) ESNET: 8542553
  2. )To connect by telephone, dial:
  • You can look up toll-free number at http://www.readytalk.com/intl
  • US and Canada: (866)740-1260 (toll free)
  • International: (303)248-0285 (toll call)
  • enter access code followed by the # sign: 3421244#

Hardware Agenda

  1. Announcement
  2. Collaboration Meeting
  3. FDC Update
    1. fADC125 event
  4. CDC Update CDC_216_channels
  5. Data Formats

Minutes

Present: Curtis, Naomi, David, Lubomir, Mark Ito, Eugene, Mark Dalton, Beni

  1. Announcement
  2. Collaboration Meeting
    1. One talk is enough for each detector, Lubomir would like 20 minutes on cluster counting
  3. FDC Update
  4. CDC Update
    1. We discussed monitoring CDC preamp temperature. For the FDC the coolant temp will be monitored. For the CDC it would be easier to monitor the air temp near to the preamps than the preamp chip temp itself.
    2. There is a slight difference (few ns) in measured time between the 3 fadcs, probably due to their clocks not being synchronised.
    3. The drift times are showing spikes, common to all channels on the same HVB.
    4. It looks like one channel disappeared between runs; the raw data are all zeros (no noise) so the pedestal probably dropped.
  5. Data Formats
    1. David will contact Cody to find out if our proposed data format is reasonably achievable.