Difference between revisions of "Solenoid Expert"
From GlueXWiki
m (Text replacement - "http://argus.phys.uregina.ca/cgi-bin/private" to "https://halldweb.jlab.org/doc-private") |
|||
(3 intermediate revisions by one other user not shown) | |||
Line 33: | Line 33: | ||
== Magnet == | == Magnet == | ||
− | * [ | + | * [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=2378 Post-construction description: GlueX note 2378] |
* [[Solenoid_References | References: GlueX notes in DocDB]] | * [[Solenoid_References | References: GlueX notes in DocDB]] | ||
* [https://www.jlab.org/Hall-D/solenoid/modifications_2015_sep Modifications of the Cooling Scheme - September 2015] | * [https://www.jlab.org/Hall-D/solenoid/modifications_2015_sep Modifications of the Cooling Scheme - September 2015] | ||
Line 44: | Line 44: | ||
* [[Fast_Monitoring_System_-_PXI | PXI Fast DAQ System ]] | * [[Fast_Monitoring_System_-_PXI | PXI Fast DAQ System ]] | ||
− | = Operational Experience = | + | == Operational Experience == |
+ | * Regular operation | ||
+ | * Anomalies | ||
+ | ** [[Solenoid_dumps | Unintended current dumps ]] | ||
+ | ** [https://www.jlab.org/Hall-D/solenoid/v_spikes/ Voltage spikes in Coil #2] | ||
+ | ** [https://www.jlab.org/Hall-D/solenoid/events Quenches ] | ||
= Old Wiki Page = | = Old Wiki Page = | ||
[https://halldweb.jlab.org/wiki/index.php/Superconducting_Solenoid https://halldweb1.jlab.org/wiki/index.php/Superconducting_Solenoid] | [https://halldweb.jlab.org/wiki/index.php/Superconducting_Solenoid https://halldweb1.jlab.org/wiki/index.php/Superconducting_Solenoid] |
Latest revision as of 17:14, 24 February 2017
Contents
Operations
Wiki Instructions
- Short description and operation guidelines
- Instructions for shift takers
- Programmable Logic Control (PLC)
- PXI Fast DAQ System
Operational Safety Procedures (OSP) : signed documents
- Hall D Solenoid Magnet - Cryogenic Operations: ENG-12-19709-OSP
- Hall D Solenoid Power Supply Test and Maintenance: -13-21781-OSP
- Hall D Solenoid Powered Operations OSP: FEL-13-22021-OSP
Other Procedures and Checklists : signed documents
- Solenoid Cooldown Checklists: D000000402-P003 Rev A
- Solenoid Vacuum System Controls Check Procedure: D000000402P004
- Hall D Solenoid System Hi-Pot Procedure: D000000402P006 RevA
- Solenoid Voltage Tap Check List: D000000402-P010
- Hall D Solenoid Pre Power-Up Checklists: D000000402P007
- Hall D Solenoid Magnet Power Supply Maintenance Turn-on Checklist: D000001611P000 Rev A
- Hall D Solenoid Magnet Power Supply Internal Interlock Checklist: D000001611P001 Rev B
- Ground Fault Detector Rheostat Setting Procedure: D000000402P011
- Hall D Solenoid System Hi-Pot Procedure: D000000402P006 RevA
- Solenoid Quench Detector Tuning Procedure: D000000402P005
- Hall-D Solenoid Commissioning Procedure: D000000402P002
Technical Information
Magnet
- Post-construction description: GlueX note 2378
- References: GlueX notes in DocDB
- Modifications of the Cooling Scheme - September 2015
- Magnetic field
Controls
Operational Experience
- Regular operation
- Anomalies
Old Wiki Page
https://halldweb1.jlab.org/wiki/index.php/Superconducting_Solenoid