Short pages
From GlueXWiki
Showing below up to 250 results in range #501 to #750.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)
- (hist) Calorimetry [129 bytes]
- (hist) Private:Draft Answers to Charge on Shift Policy for GlueX [129 bytes]
- (hist) Electronics Workshops/Pre-Meetings [130 bytes]
- (hist) Start Counter Geometry Discussion, February 27, 2014 [131 bytes]
- (hist) Private:Photon Beam and Tagger Instrumentation Paper (2010) [131 bytes]
- (hist) Private:Quality Assurance Meeting with Eljen, March 17, 2014 [132 bytes]
- (hist) Planned mechanical/construction tests [132 bytes]
- (hist) FCAl DAQ Meetings [132 bytes]
- (hist) Beam Test Cabling [134 bytes]
- (hist) Specification for high-resolution tagging microscope [134 bytes]
- (hist) Specification for post-collimator beamline and shielding [134 bytes]
- (hist) HV pleateau curves (aka efficiency plots) with old preAmp [136 bytes]
- (hist) Fall 2013 Charged Pion Polarizability Workshop [137 bytes]
- (hist) BCAL Mechanical Meetings [138 bytes]
- (hist) March 16, 2009 (11AM), Physics Working Group [138 bytes]
- (hist) January 11, 2022 [138 bytes]
- (hist) Coil Test Weekly Meeting 4-Nov-2010 [139 bytes]
- (hist) Target Cheat Sheet [139 bytes]
- (hist) Random number seeds for Data Challenge 1 [139 bytes]
- (hist) 2007-07-11 [140 bytes]
- (hist) Feb 9, 2017 [141 bytes]
- (hist) Feb 9, 2018 [141 bytes]
- (hist) Installation of Module [143 bytes]
- (hist) Data Challenge 2 Event Tally Board [143 bytes]
- (hist) List of runs 2021 [144 bytes]
- (hist) HOWTO Check for memory leaks with valgrind [145 bytes]
- (hist) EventStore Run Metadata [146 bytes]
- (hist) June 2, 2014 [146 bytes]
- (hist) Π polarizability Meeting Jul 27, 2017 [146 bytes]
- (hist) Lead Glass Efforts [146 bytes]
- (hist) Adding a new user [147 bytes]
- (hist) Sag test [148 bytes]
- (hist) Detector Systems [150 bytes]
- (hist) Fall 2016 Run time charts progress [150 bytes]
- (hist) Visual Inspection [152 bytes]
- (hist) CTOF and CTOF Trigger [152 bytes]
- (hist) TOSCA simulation [153 bytes]
- (hist) Emittance measurements [154 bytes]
- (hist) Controls Meeting 03-May-2018 [155 bytes]
- (hist) 2007-04-18 [156 bytes]
- (hist) Beam commissioning in Fall 2014 [156 bytes]
- (hist) Beam commissioning: Fall 2014 [156 bytes]
- (hist) CollimatorMtgs-3-5-2013 [157 bytes]
- (hist) Private:Trigger Types [157 bytes]
- (hist) New hv-plateau/efficiency curve [158 bytes]
- (hist) TOF Rates 2023 [158 bytes]
- (hist) Calibration [159 bytes]
- (hist) JEF meeting, May 31, 2016 [161 bytes]
- (hist) Compton Calorimeter [161 bytes]
- (hist) November 16, 2015 [162 bytes]
- (hist) CDC Calibration Alignment [163 bytes]
- (hist) Merging two triggers in the same event [163 bytes]
- (hist) List of Runs 2022 [164 bytes]
- (hist) FDC geometry May09 [165 bytes]
- (hist) Controls Meeting 20-Aug-2015 [165 bytes]
- (hist) Controls Meeting 11-Nov-2015 [165 bytes]
- (hist) Accessing the JLab Picture Archive [166 bytes]
- (hist) Upgrade of the FCAL [166 bytes]
- (hist) Getting an Account on the GlueX Wiki [167 bytes]
- (hist) August 31, 2009 (11AM), Physics Working Group [168 bytes]
- (hist) GlueX Target Design Review, September 29, 2011 [168 bytes]
- (hist) Controls Meeting 9-Jul-2020 [168 bytes]
- (hist) R&D [168 bytes]
- (hist) KL Physics Meetings [172 bytes]
- (hist) Solenoid Meetings [173 bytes]
- (hist) Beam request (run in 2021) [173 bytes]
- (hist) Rack locations in the tagger hall [174 bytes]
- (hist) Superconducting Solenoid [177 bytes]
- (hist) KL Physics Workshops [177 bytes]
- (hist) Final Versions [177 bytes]
- (hist) Final Versions of Proposed Bylaw and Management Plan changes [177 bytes]
- (hist) Beam Data [179 bytes]
- (hist) PS Construction [179 bytes]
- (hist) BCAL reconstruction 03/07/2013 [180 bytes]
- (hist) Controls Meeting 4-Feb-2016 [180 bytes]
- (hist) Controls Meeting 13-Oct-2016 [180 bytes]
- (hist) LMS photographs, March 18 [180 bytes]
- (hist) Controls Meeting 1-Sep-2016 [181 bytes]
- (hist) SiPM timing resolution [182 bytes]
- (hist) Hit pattern [182 bytes]
- (hist) Controls Meeting 28-Apr-2016 [182 bytes]
- (hist) Monitoring fadc250 in mode 7 [184 bytes]
- (hist) Commissioning Run, Fall 2018 [184 bytes]
- (hist) Controls Meeting 16-Mar-2023 [184 bytes]
- (hist) Energy Resolution Plot [185 bytes]
- (hist) Charge to the committee [185 bytes]
- (hist) 2014 [185 bytes]
- (hist) Letter from Paul to Mark [185 bytes]
- (hist) Beam request (expect to run in 2021) [185 bytes]
- (hist) Testing labeling cables [186 bytes]
- (hist) Status & Schedules [187 bytes]
- (hist) 2007-02-28 [189 bytes]
- (hist) TAGM / TAGM [189 bytes]
- (hist) TAGM / TAGH [189 bytes]
- (hist) Controls Meeting 4-Aug-2016 [189 bytes]
- (hist) Documentation Initiative [190 bytes]
- (hist) Prototypes of FDC online monitoring histograms [192 bytes]
- (hist) Beam commissioning: Fall 2015 [192 bytes]
- (hist) Physics Simulation Meetings [193 bytes]
- (hist) Beam Test Analyses and Results [195 bytes]
- (hist) SICCAS [195 bytes]
- (hist) Passive Shielding [197 bytes]
- (hist) PS and ST [198 bytes]
- (hist) Controls Meeting 15-Oct-2015 [198 bytes]
- (hist) Track matching to single FCAL hits [199 bytes]
- (hist) Leak tests [200 bytes]
- (hist) FDC Overview [201 bytes]
- (hist) Frame and Engineering [201 bytes]
- (hist) Gluing Fixture [202 bytes]
- (hist) Controls Meeting 17-May-2018 [202 bytes]
- (hist) Analysis Shift Meeting Agenda [202 bytes]
- (hist) JLab Data Challenge Status, April 30, 2014 [203 bytes]
- (hist) Controls Meeting 08-Feb-2018 [206 bytes]
- (hist) Tagger Quadrupole Survey Measurements [207 bytes]
- (hist) 2016 [207 bytes]
- (hist) Short term CALWG Items [208 bytes]
- (hist) L1 Trigger bank in the reconstruction [209 bytes]
- (hist) Agenda 060515 [210 bytes]
- (hist) Sag, compression, and twist test [210 bytes]
- (hist) Heated gas measurements [213 bytes]
- (hist) Controls Meeting 17-Mar-2016 [214 bytes]
- (hist) Measurement Crystal Dimensions (NPS Lab) [214 bytes]
- (hist) Alcove and Cart [215 bytes]
- (hist) Pythia background [215 bytes]
- (hist) Calibration Workflow [215 bytes]
- (hist) QA Setups at JLab [215 bytes]
- (hist) Beam Commissioning Plan [216 bytes]
- (hist) Luminosity [216 bytes]
- (hist) 2007-03-21 [217 bytes]
- (hist) Building and Using the GlueX Software [217 bytes]
- (hist) Start Counter Silicon Photomultiplier Read-Out [217 bytes]
- (hist) October 9, 2013 [217 bytes]
- (hist) Time difference resolution [218 bytes]
- (hist) Accelerometers with cheap Knocking sensor [219 bytes]
- (hist) CPP Scintillators [219 bytes]
- (hist) 2007-05-23 [221 bytes]
- (hist) Controls Meeting 11-Jun-2020 [223 bytes]
- (hist) 2007-10-03 [224 bytes]
- (hist) Preliminary dimensions [224 bytes]
- (hist) Dimensions [225 bytes]
- (hist) Mar 19, 2020 Tech Telecon Meeting [226 bytes]
- (hist) UPS in solenoid controls rack [227 bytes]
- (hist) August 09, 2022 FCAL Insert Installation Meeting [227 bytes]
- (hist) TRIUMF Ultra-Thin Chamber cathode foils [228 bytes]
- (hist) Spare Solenoid Meetings [230 bytes]
- (hist) 20140625 BCAL Timing [230 bytes]
- (hist) July 14, 2014 [231 bytes]
- (hist) SiPM Hamamatsu 3x3 : Laser [233 bytes]
- (hist) Targets [233 bytes]
- (hist) Background studies [234 bytes]
- (hist) Controls Meeting 22-Mar-2018 [234 bytes]
- (hist) Coil Test Weekly Meeting 2-Jul-2009 [236 bytes]
- (hist) December 2, 2014 [236 bytes]
- (hist) July 21, 2009 (11AM), Physics Simulations [237 bytes]
- (hist) Calorimetry F250 Firmware [239 bytes]
- (hist) TOF clusters [240 bytes]
- (hist) Jan 17, 2014 Design Meeting [241 bytes]
- (hist) Software Spreadsheet Meeting, October 31, 2016 [242 bytes]
- (hist) Controls Meeting 14-May-2015 [243 bytes]
- (hist) List of bad channels [244 bytes]
- (hist) BCAL Commissioning [246 bytes]
- (hist) Long term items [246 bytes]
- (hist) CPP-NPP DAQ Configuration [246 bytes]
- (hist) Crystals [247 bytes]
- (hist) Tracking-3-30-2023 [248 bytes]
- (hist) Controls Meeting 11-May-2017 [249 bytes]
- (hist) Tracking [250 bytes]
- (hist) Mar 10 [250 bytes]
- (hist) Dinner 18:00 ( Das Waldcafe) [251 bytes]
- (hist) Dinner 18:00 [251 bytes]
- (hist) Dinner 18:30 [251 bytes]
- (hist) 2015 [251 bytes]
- (hist) Data Analysis [251 bytes]
- (hist) 2007-03-14 [252 bytes]
- (hist) Controls Meeting 31-Aug-2017 [252 bytes]
- (hist) April 4, 2016 [254 bytes]
- (hist) 11/27/2019 [254 bytes]
- (hist) QA Check at JLab [254 bytes]
- (hist) Connection to Jlab meetings [255 bytes]
- (hist) GlueX Communications [257 bytes]
- (hist) January 4th, 2017 [259 bytes]
- (hist) Tracking Resolutions and Efficiencies [259 bytes]
- (hist) SRC/CT Analysis Page [259 bytes]
- (hist) Private:Pair Spectrometer beam test [260 bytes]
- (hist) Controls Meeting 26-May-2016 [262 bytes]
- (hist) FCAL time/energy calibrations [263 bytes]
- (hist) Deprecated: Kinematic Fitter [264 bytes]
- (hist) Data Challenge 3 [264 bytes]
- (hist) Ded [265 bytes]
- (hist) Scalers [265 bytes]
- (hist) Controls Meeting 8-Jun-2017 [266 bytes]
- (hist) Light guid tests [267 bytes]
- (hist) Light guide tests [267 bytes]
- (hist) Water Sample Test Tracking [268 bytes]
- (hist) Beam Test Shift Schedule [269 bytes]
- (hist) Controls Meeting 14-Nov-2019 [269 bytes]
- (hist) Crate and channel assignment [270 bytes]
- (hist) Start Counter geometry changes [273 bytes]
- (hist) JEF meeting, Jun 13, 20016 [273 bytes]
- (hist) JEF spokesperson meeting, November 14, 2023 [273 bytes]
- (hist) Reconstruction, Sept 8, 2009 [274 bytes]
- (hist) Beam Test Meeting Mon. Apr. 02, 2012 [274 bytes]
- (hist) CollimatorMtgs-6-8-2015 [274 bytes]
- (hist) HOWTO build a GlueX Software structure just like that at JLab [274 bytes]
- (hist) Running Fall 2014 [275 bytes]
- (hist) GlueX PID Meeting, October, 2022 [275 bytes]
- (hist) GlueX PID Meeting, October 25, 2022 [275 bytes]
- (hist) GlueX PID Meeting, January 31, 2023 [275 bytes]
- (hist) GlueX PID Meeting, March 7, 2023 [275 bytes]
- (hist) Patch panels and cables [275 bytes]
- (hist) August 10, 2015 [276 bytes]
- (hist) 2015, Practice Talks [276 bytes]
- (hist) QA check of Received Crystals [276 bytes]
- (hist) GlueX PID Meeting, January 11, 2022 [276 bytes]
- (hist) GlueX PID Meeting, February 22, 2022 [276 bytes]
- (hist) GlueX PID Meeting, March 8, 2022 [276 bytes]
- (hist) GlueX PID Meeting, April 5, 2022 [276 bytes]
- (hist) GlueX PID Meeting, April 19, 2022 [276 bytes]
- (hist) GlueX PID Meeting, May 17, 2022 [276 bytes]
- (hist) GlueX PID Meeting, August 22, 2022 [276 bytes]
- (hist) August 28, 2006 Software [278 bytes]
- (hist) Radiation length scans [278 bytes]
- (hist) Controls Meeting 3-Aug-2017 [282 bytes]
- (hist) Sdobbs timing resolution notes [282 bytes]
- (hist) Publications [285 bytes]
- (hist) TOF PMT Shipping schedule [286 bytes]
- (hist) March 7, 2016 [288 bytes]
- (hist) Controls Meeting 20-Jul-2016 [288 bytes]
- (hist) Controls Meeting 21-Jul-2016 [288 bytes]
- (hist) Scaler specifications [290 bytes]
- (hist) Special meetings about photon beam fast raster [290 bytes]
- (hist) BCAL Reconstruction Software [291 bytes]
- (hist) AMCDrawings Used for calculations [291 bytes]
- (hist) Controls Meeting 22-Jun-2017 [291 bytes]
- (hist) Controls Meeting 23-Jan-2020 [292 bytes]
- (hist) Brief Report on Yianna's ADC fits for SensL SiPMs [293 bytes]
- (hist) Run Coordinator report: Fall 2018 w10 [294 bytes]
- (hist) 10/13/2020 [296 bytes]
- (hist) Diamond radiators [298 bytes]
- (hist) BLTWG Meeting 03/21/2011 [300 bytes]
- (hist) Controls Meeting 26-Oct-2017 [301 bytes]
- (hist) October 26, 2022 FCAL Insert Cable Installation Meeting [301 bytes]
- (hist) Electronics Action Items [302 bytes]
- (hist) BLTWG Meeting 7/3/2008 [302 bytes]
- (hist) Controls Meeting 20-Feb-2020 [302 bytes]
- (hist) Getting Started with GlueX Software [304 bytes]
- (hist) March 25 LMS update [304 bytes]
- (hist) 2007-04-11 [305 bytes]
- (hist) PMT FEU-84-3 [305 bytes]
- (hist) Electron trajectories [305 bytes]