Short pages

From GlueXWiki
Jump to: navigation, search

Showing below up to 500 results in range #501 to #1,000.

View (previous 500 | next 500) (20 | 50 | 100 | 250 | 500)

  1. (hist) ‎Calorimetry ‎[129 bytes]
  2. (hist) ‎Private:Draft Answers to Charge on Shift Policy for GlueX ‎[129 bytes]
  3. (hist) ‎Electronics Workshops/Pre-Meetings ‎[130 bytes]
  4. (hist) ‎Start Counter Geometry Discussion, February 27, 2014 ‎[131 bytes]
  5. (hist) ‎Private:Photon Beam and Tagger Instrumentation Paper (2010) ‎[131 bytes]
  6. (hist) ‎Private:Quality Assurance Meeting with Eljen, March 17, 2014 ‎[132 bytes]
  7. (hist) ‎Planned mechanical/construction tests ‎[132 bytes]
  8. (hist) ‎FCAl DAQ Meetings ‎[132 bytes]
  9. (hist) ‎Beam Test Cabling ‎[134 bytes]
  10. (hist) ‎Specification for high-resolution tagging microscope ‎[134 bytes]
  11. (hist) ‎Specification for post-collimator beamline and shielding ‎[134 bytes]
  12. (hist) ‎HV pleateau curves (aka efficiency plots) with old preAmp ‎[136 bytes]
  13. (hist) ‎Fall 2013 Charged Pion Polarizability Workshop ‎[137 bytes]
  14. (hist) ‎BCAL Mechanical Meetings ‎[138 bytes]
  15. (hist) ‎March 16, 2009 (11AM), Physics Working Group ‎[138 bytes]
  16. (hist) ‎January 11, 2022 ‎[138 bytes]
  17. (hist) ‎Coil Test Weekly Meeting 4-Nov-2010 ‎[139 bytes]
  18. (hist) ‎Target Cheat Sheet ‎[139 bytes]
  19. (hist) ‎Random number seeds for Data Challenge 1 ‎[139 bytes]
  20. (hist) ‎2007-07-11 ‎[140 bytes]
  21. (hist) ‎Feb 9, 2017 ‎[141 bytes]
  22. (hist) ‎Feb 9, 2018 ‎[141 bytes]
  23. (hist) ‎Installation of Module ‎[143 bytes]
  24. (hist) ‎Data Challenge 2 Event Tally Board ‎[143 bytes]
  25. (hist) ‎List of runs 2021 ‎[144 bytes]
  26. (hist) ‎HOWTO Check for memory leaks with valgrind ‎[145 bytes]
  27. (hist) ‎EventStore Run Metadata ‎[146 bytes]
  28. (hist) ‎June 2, 2014 ‎[146 bytes]
  29. (hist) ‎Π polarizability Meeting Jul 27, 2017 ‎[146 bytes]
  30. (hist) ‎Lead Glass Efforts ‎[146 bytes]
  31. (hist) ‎Adding a new user ‎[147 bytes]
  32. (hist) ‎Sag test ‎[148 bytes]
  33. (hist) ‎Detector Systems ‎[150 bytes]
  34. (hist) ‎Fall 2016 Run time charts progress ‎[150 bytes]
  35. (hist) ‎Visual Inspection ‎[152 bytes]
  36. (hist) ‎CTOF and CTOF Trigger ‎[152 bytes]
  37. (hist) ‎TOSCA simulation ‎[153 bytes]
  38. (hist) ‎Emittance measurements ‎[154 bytes]
  39. (hist) ‎Controls Meeting 03-May-2018 ‎[155 bytes]
  40. (hist) ‎2007-04-18 ‎[156 bytes]
  41. (hist) ‎Beam commissioning in Fall 2014 ‎[156 bytes]
  42. (hist) ‎Beam commissioning: Fall 2014 ‎[156 bytes]
  43. (hist) ‎CollimatorMtgs-3-5-2013 ‎[157 bytes]
  44. (hist) ‎Private:Trigger Types ‎[157 bytes]
  45. (hist) ‎New hv-plateau/efficiency curve ‎[158 bytes]
  46. (hist) ‎TOF Rates 2023 ‎[158 bytes]
  47. (hist) ‎Calibration ‎[159 bytes]
  48. (hist) ‎JEF meeting, May 31, 2016 ‎[161 bytes]
  49. (hist) ‎Compton Calorimeter ‎[161 bytes]
  50. (hist) ‎November 16, 2015 ‎[162 bytes]
  51. (hist) ‎CDC Calibration Alignment ‎[163 bytes]
  52. (hist) ‎Merging two triggers in the same event ‎[163 bytes]
  53. (hist) ‎List of Runs 2022 ‎[164 bytes]
  54. (hist) ‎FDC geometry May09 ‎[165 bytes]
  55. (hist) ‎Controls Meeting 20-Aug-2015 ‎[165 bytes]
  56. (hist) ‎Controls Meeting 11-Nov-2015 ‎[165 bytes]
  57. (hist) ‎Accessing the JLab Picture Archive ‎[166 bytes]
  58. (hist) ‎Upgrade of the FCAL ‎[166 bytes]
  59. (hist) ‎Getting an Account on the GlueX Wiki ‎[167 bytes]
  60. (hist) ‎August 31, 2009 (11AM), Physics Working Group ‎[168 bytes]
  61. (hist) ‎GlueX Target Design Review, September 29, 2011 ‎[168 bytes]
  62. (hist) ‎Controls Meeting 9-Jul-2020 ‎[168 bytes]
  63. (hist) ‎R&D ‎[168 bytes]
  64. (hist) ‎KL Physics Meetings ‎[172 bytes]
  65. (hist) ‎Solenoid Meetings ‎[173 bytes]
  66. (hist) ‎Beam request (run in 2021) ‎[173 bytes]
  67. (hist) ‎Rack locations in the tagger hall ‎[174 bytes]
  68. (hist) ‎Superconducting Solenoid ‎[177 bytes]
  69. (hist) ‎KL Physics Workshops ‎[177 bytes]
  70. (hist) ‎Final Versions ‎[177 bytes]
  71. (hist) ‎Final Versions of Proposed Bylaw and Management Plan changes ‎[177 bytes]
  72. (hist) ‎Beam Data ‎[179 bytes]
  73. (hist) ‎PS Construction ‎[179 bytes]
  74. (hist) ‎BCAL reconstruction 03/07/2013 ‎[180 bytes]
  75. (hist) ‎Controls Meeting 4-Feb-2016 ‎[180 bytes]
  76. (hist) ‎Controls Meeting 13-Oct-2016 ‎[180 bytes]
  77. (hist) ‎LMS photographs, March 18 ‎[180 bytes]
  78. (hist) ‎Controls Meeting 1-Sep-2016 ‎[181 bytes]
  79. (hist) ‎SiPM timing resolution ‎[182 bytes]
  80. (hist) ‎Hit pattern ‎[182 bytes]
  81. (hist) ‎Controls Meeting 28-Apr-2016 ‎[182 bytes]
  82. (hist) ‎Monitoring fadc250 in mode 7 ‎[184 bytes]
  83. (hist) ‎Commissioning Run, Fall 2018 ‎[184 bytes]
  84. (hist) ‎Controls Meeting 16-Mar-2023 ‎[184 bytes]
  85. (hist) ‎Energy Resolution Plot ‎[185 bytes]
  86. (hist) ‎Charge to the committee ‎[185 bytes]
  87. (hist) ‎2014 ‎[185 bytes]
  88. (hist) ‎Letter from Paul to Mark ‎[185 bytes]
  89. (hist) ‎Beam request (expect to run in 2021) ‎[185 bytes]
  90. (hist) ‎Testing labeling cables ‎[186 bytes]
  91. (hist) ‎Status & Schedules ‎[187 bytes]
  92. (hist) ‎2007-02-28 ‎[189 bytes]
  93. (hist) ‎TAGM / TAGM ‎[189 bytes]
  94. (hist) ‎TAGM / TAGH ‎[189 bytes]
  95. (hist) ‎Controls Meeting 4-Aug-2016 ‎[189 bytes]
  96. (hist) ‎Documentation Initiative ‎[190 bytes]
  97. (hist) ‎Prototypes of FDC online monitoring histograms ‎[192 bytes]
  98. (hist) ‎Beam commissioning: Fall 2015 ‎[192 bytes]
  99. (hist) ‎Physics Simulation Meetings ‎[193 bytes]
  100. (hist) ‎Beam Test Analyses and Results ‎[195 bytes]
  101. (hist) ‎SICCAS ‎[195 bytes]
  102. (hist) ‎Passive Shielding ‎[197 bytes]
  103. (hist) ‎PS and ST ‎[198 bytes]
  104. (hist) ‎Controls Meeting 15-Oct-2015 ‎[198 bytes]
  105. (hist) ‎Track matching to single FCAL hits ‎[199 bytes]
  106. (hist) ‎Leak tests ‎[200 bytes]
  107. (hist) ‎FDC Overview ‎[201 bytes]
  108. (hist) ‎Frame and Engineering ‎[201 bytes]
  109. (hist) ‎Gluing Fixture ‎[202 bytes]
  110. (hist) ‎Controls Meeting 17-May-2018 ‎[202 bytes]
  111. (hist) ‎Analysis Shift Meeting Agenda ‎[202 bytes]
  112. (hist) ‎JLab Data Challenge Status, April 30, 2014 ‎[203 bytes]
  113. (hist) ‎Controls Meeting 08-Feb-2018 ‎[206 bytes]
  114. (hist) ‎Tagger Quadrupole Survey Measurements ‎[207 bytes]
  115. (hist) ‎2016 ‎[207 bytes]
  116. (hist) ‎L1 Trigger bank in the reconstruction ‎[209 bytes]
  117. (hist) ‎Agenda 060515 ‎[210 bytes]
  118. (hist) ‎Sag, compression, and twist test ‎[210 bytes]
  119. (hist) ‎Heated gas measurements ‎[213 bytes]
  120. (hist) ‎Controls Meeting 17-Mar-2016 ‎[214 bytes]
  121. (hist) ‎Measurement Crystal Dimensions (NPS Lab) ‎[214 bytes]
  122. (hist) ‎Alcove and Cart ‎[215 bytes]
  123. (hist) ‎Pythia background ‎[215 bytes]
  124. (hist) ‎Calibration Workflow ‎[215 bytes]
  125. (hist) ‎QA Setups at JLab ‎[215 bytes]
  126. (hist) ‎Beam Commissioning Plan ‎[216 bytes]
  127. (hist) ‎Luminosity ‎[216 bytes]
  128. (hist) ‎2007-03-21 ‎[217 bytes]
  129. (hist) ‎Building and Using the GlueX Software ‎[217 bytes]
  130. (hist) ‎Start Counter Silicon Photomultiplier Read-Out ‎[217 bytes]
  131. (hist) ‎October 9, 2013 ‎[217 bytes]
  132. (hist) ‎Time difference resolution ‎[218 bytes]
  133. (hist) ‎Accelerometers with cheap Knocking sensor ‎[219 bytes]
  134. (hist) ‎CPP Scintillators ‎[219 bytes]
  135. (hist) ‎2007-05-23 ‎[221 bytes]
  136. (hist) ‎Controls Meeting 11-Jun-2020 ‎[223 bytes]
  137. (hist) ‎2007-10-03 ‎[224 bytes]
  138. (hist) ‎Preliminary dimensions ‎[224 bytes]
  139. (hist) ‎Dimensions ‎[225 bytes]
  140. (hist) ‎Mar 19, 2020 Tech Telecon Meeting ‎[226 bytes]
  141. (hist) ‎UPS in solenoid controls rack ‎[227 bytes]
  142. (hist) ‎August 09, 2022 FCAL Insert Installation Meeting ‎[227 bytes]
  143. (hist) ‎TRIUMF Ultra-Thin Chamber cathode foils ‎[228 bytes]
  144. (hist) ‎Spare Solenoid Meetings ‎[230 bytes]
  145. (hist) ‎20140625 BCAL Timing ‎[230 bytes]
  146. (hist) ‎July 14, 2014 ‎[231 bytes]
  147. (hist) ‎SiPM Hamamatsu 3x3 : Laser ‎[233 bytes]
  148. (hist) ‎Targets ‎[233 bytes]
  149. (hist) ‎Background studies ‎[234 bytes]
  150. (hist) ‎Controls Meeting 22-Mar-2018 ‎[234 bytes]
  151. (hist) ‎Coil Test Weekly Meeting 2-Jul-2009 ‎[236 bytes]
  152. (hist) ‎December 2, 2014 ‎[236 bytes]
  153. (hist) ‎July 21, 2009 (11AM), Physics Simulations ‎[237 bytes]
  154. (hist) ‎Calorimetry F250 Firmware ‎[239 bytes]
  155. (hist) ‎TOF clusters ‎[240 bytes]
  156. (hist) ‎Jan 17, 2014 Design Meeting ‎[241 bytes]
  157. (hist) ‎Software Spreadsheet Meeting, October 31, 2016 ‎[242 bytes]
  158. (hist) ‎Controls Meeting 14-May-2015 ‎[243 bytes]
  159. (hist) ‎List of bad channels ‎[244 bytes]
  160. (hist) ‎BCAL Commissioning ‎[246 bytes]
  161. (hist) ‎CPP-NPP DAQ Configuration ‎[246 bytes]
  162. (hist) ‎Crystals ‎[247 bytes]
  163. (hist) ‎Tracking-3-30-2023 ‎[248 bytes]
  164. (hist) ‎Controls Meeting 11-May-2017 ‎[249 bytes]
  165. (hist) ‎Tracking ‎[250 bytes]
  166. (hist) ‎Mar 10 ‎[250 bytes]
  167. (hist) ‎Dinner 18:00 ( Das Waldcafe) ‎[251 bytes]
  168. (hist) ‎Dinner 18:00 ‎[251 bytes]
  169. (hist) ‎Dinner 18:30 ‎[251 bytes]
  170. (hist) ‎2015 ‎[251 bytes]
  171. (hist) ‎Data Analysis ‎[251 bytes]
  172. (hist) ‎2007-03-14 ‎[252 bytes]
  173. (hist) ‎Controls Meeting 31-Aug-2017 ‎[252 bytes]
  174. (hist) ‎April 4, 2016 ‎[254 bytes]
  175. (hist) ‎11/27/2019 ‎[254 bytes]
  176. (hist) ‎QA Check at JLab ‎[254 bytes]
  177. (hist) ‎Connection to Jlab meetings ‎[255 bytes]
  178. (hist) ‎GlueX Communications ‎[257 bytes]
  179. (hist) ‎January 4th, 2017 ‎[259 bytes]
  180. (hist) ‎Tracking Resolutions and Efficiencies ‎[259 bytes]
  181. (hist) ‎SRC/CT Analysis Page ‎[259 bytes]
  182. (hist) ‎Private:Pair Spectrometer beam test ‎[260 bytes]
  183. (hist) ‎Controls Meeting 26-May-2016 ‎[262 bytes]
  184. (hist) ‎FCAL time/energy calibrations ‎[263 bytes]
  185. (hist) ‎Deprecated: Kinematic Fitter ‎[264 bytes]
  186. (hist) ‎Data Challenge 3 ‎[264 bytes]
  187. (hist) ‎Ded ‎[265 bytes]
  188. (hist) ‎Scalers ‎[265 bytes]
  189. (hist) ‎Controls Meeting 8-Jun-2017 ‎[266 bytes]
  190. (hist) ‎Light guid tests ‎[267 bytes]
  191. (hist) ‎Light guide tests ‎[267 bytes]
  192. (hist) ‎Water Sample Test Tracking ‎[268 bytes]
  193. (hist) ‎Beam Test Shift Schedule ‎[269 bytes]
  194. (hist) ‎Controls Meeting 14-Nov-2019 ‎[269 bytes]
  195. (hist) ‎Crate and channel assignment ‎[270 bytes]
  196. (hist) ‎Start Counter geometry changes ‎[273 bytes]
  197. (hist) ‎JEF meeting, Jun 13, 20016 ‎[273 bytes]
  198. (hist) ‎JEF spokesperson meeting, November 14, 2023 ‎[273 bytes]
  199. (hist) ‎Reconstruction, Sept 8, 2009 ‎[274 bytes]
  200. (hist) ‎Beam Test Meeting Mon. Apr. 02, 2012 ‎[274 bytes]
  201. (hist) ‎CollimatorMtgs-6-8-2015 ‎[274 bytes]
  202. (hist) ‎HOWTO build a GlueX Software structure just like that at JLab ‎[274 bytes]
  203. (hist) ‎Running Fall 2014 ‎[275 bytes]
  204. (hist) ‎GlueX PID Meeting, October, 2022 ‎[275 bytes]
  205. (hist) ‎GlueX PID Meeting, October 25, 2022 ‎[275 bytes]
  206. (hist) ‎GlueX PID Meeting, January 31, 2023 ‎[275 bytes]
  207. (hist) ‎GlueX PID Meeting, March 7, 2023 ‎[275 bytes]
  208. (hist) ‎Patch panels and cables ‎[275 bytes]
  209. (hist) ‎August 10, 2015 ‎[276 bytes]
  210. (hist) ‎2015, Practice Talks ‎[276 bytes]
  211. (hist) ‎QA check of Received Crystals ‎[276 bytes]
  212. (hist) ‎GlueX PID Meeting, January 11, 2022 ‎[276 bytes]
  213. (hist) ‎GlueX PID Meeting, February 22, 2022 ‎[276 bytes]
  214. (hist) ‎GlueX PID Meeting, March 8, 2022 ‎[276 bytes]
  215. (hist) ‎GlueX PID Meeting, April 5, 2022 ‎[276 bytes]
  216. (hist) ‎GlueX PID Meeting, April 19, 2022 ‎[276 bytes]
  217. (hist) ‎GlueX PID Meeting, May 17, 2022 ‎[276 bytes]
  218. (hist) ‎GlueX PID Meeting, August 22, 2022 ‎[276 bytes]
  219. (hist) ‎August 28, 2006 Software ‎[278 bytes]
  220. (hist) ‎Radiation length scans ‎[278 bytes]
  221. (hist) ‎Controls Meeting 3-Aug-2017 ‎[282 bytes]
  222. (hist) ‎Sdobbs timing resolution notes ‎[282 bytes]
  223. (hist) ‎KLONG CPS Design Meetings ‎[283 bytes]
  224. (hist) ‎Publications ‎[285 bytes]
  225. (hist) ‎TOF PMT Shipping schedule ‎[286 bytes]
  226. (hist) ‎March 7, 2016 ‎[288 bytes]
  227. (hist) ‎Controls Meeting 20-Jul-2016 ‎[288 bytes]
  228. (hist) ‎Controls Meeting 21-Jul-2016 ‎[288 bytes]
  229. (hist) ‎Scaler specifications ‎[290 bytes]
  230. (hist) ‎Special meetings about photon beam fast raster ‎[290 bytes]
  231. (hist) ‎BCAL Reconstruction Software ‎[291 bytes]
  232. (hist) ‎AMCDrawings Used for calculations ‎[291 bytes]
  233. (hist) ‎Controls Meeting 22-Jun-2017 ‎[291 bytes]
  234. (hist) ‎Controls Meeting 23-Jan-2020 ‎[292 bytes]
  235. (hist) ‎Brief Report on Yianna's ADC fits for SensL SiPMs ‎[293 bytes]
  236. (hist) ‎Run Coordinator report: Fall 2018 w10 ‎[294 bytes]
  237. (hist) ‎10/13/2020 ‎[296 bytes]
  238. (hist) ‎Diamond radiators ‎[298 bytes]
  239. (hist) ‎BLTWG Meeting 03/21/2011 ‎[300 bytes]
  240. (hist) ‎Controls Meeting 26-Oct-2017 ‎[301 bytes]
  241. (hist) ‎October 26, 2022 FCAL Insert Cable Installation Meeting ‎[301 bytes]
  242. (hist) ‎Electronics Action Items ‎[302 bytes]
  243. (hist) ‎BLTWG Meeting 7/3/2008 ‎[302 bytes]
  244. (hist) ‎Controls Meeting 20-Feb-2020 ‎[302 bytes]
  245. (hist) ‎Getting Started with GlueX Software ‎[304 bytes]
  246. (hist) ‎March 25 LMS update ‎[304 bytes]
  247. (hist) ‎2007-04-11 ‎[305 bytes]
  248. (hist) ‎PMT FEU-84-3 ‎[305 bytes]
  249. (hist) ‎Electron trajectories ‎[305 bytes]
  250. (hist) ‎Spare Solenoid ‎[306 bytes]
  251. (hist) ‎Controls Meeting 31-Oct-2019 ‎[306 bytes]
  252. (hist) ‎Compton Cross Section Systematic ‎[306 bytes]
  253. (hist) ‎Nov 2, 2022 ‎[307 bytes]
  254. (hist) ‎DIRC Spare Parts and Storage location ‎[308 bytes]
  255. (hist) ‎June 21 2021 ‎[308 bytes]
  256. (hist) ‎Controls Meeting 17-Aug-2017 ‎[309 bytes]
  257. (hist) ‎Counter Repair, Summer 2019 ‎[310 bytes]
  258. (hist) ‎GlueX TOF Meeting, December 15, 2021 ‎[310 bytes]
  259. (hist) ‎Controls Meeting 21-Aug-2014 ‎[311 bytes]
  260. (hist) ‎QA Check Shanghai (January 2020) ‎[311 bytes]
  261. (hist) ‎OWG meeting 4-Feb-2009 ‎[313 bytes]
  262. (hist) ‎Oct 4, 2013 Fab Meeting ‎[313 bytes]
  263. (hist) ‎February 26, 2021 ‎[313 bytes]
  264. (hist) ‎Crystal QA Check using Pair Spectrometer ‎[314 bytes]
  265. (hist) ‎Tracking / extrapolation to MWPCs ‎[315 bytes]
  266. (hist) ‎Photos of the electron beamline ‎[317 bytes]
  267. (hist) ‎Controls Meeting 9-Nov-2017 ‎[317 bytes]
  268. (hist) ‎Controls Meeting 10-Dec-2015 ‎[318 bytes]
  269. (hist) ‎Controls Meeting 28-May-2015 ‎[320 bytes]
  270. (hist) ‎How To ‎[321 bytes]
  271. (hist) ‎Large, usable Pythia sample ‎[322 bytes]
  272. (hist) ‎Comments from Y. Van Haarlem ‎[323 bytes]
  273. (hist) ‎Fall 2022 Run Coordination Meetings ‎[323 bytes]
  274. (hist) ‎Controls Meeting 9-Jun-2016 ‎[324 bytes]
  275. (hist) ‎HallD AI/ML ‎[324 bytes]
  276. (hist) ‎Reconstruction, Oct 20, 2009 ‎[325 bytes]
  277. (hist) ‎January 24, 2022 ‎[325 bytes]
  278. (hist) ‎Controls Meeting 14-Jun-2018 ‎[326 bytes]
  279. (hist) ‎January 5, 2023 ‎[326 bytes]
  280. (hist) ‎Specification for pair spectrometer and target ‎[327 bytes]
  281. (hist) ‎Pixel recovery time ‎[327 bytes]
  282. (hist) ‎June 7, 2013 Design Meeting ‎[327 bytes]
  283. (hist) ‎GlueX Software Review Meetings ‎[327 bytes]
  284. (hist) ‎Controls Meeting 28-Sep-2017 ‎[327 bytes]
  285. (hist) ‎Controls Meeting 1-Oct-2020 ‎[327 bytes]
  286. (hist) ‎August 8, 2014 ‎[328 bytes]
  287. (hist) ‎September 8, 2014 ‎[328 bytes]
  288. (hist) ‎Nov 8, 2013 Design Meeting ‎[329 bytes]
  289. (hist) ‎GlueX Containers Meetings ‎[329 bytes]
  290. (hist) ‎List ‎[329 bytes]
  291. (hist) ‎August 17, 2009 (11AM), Physics Working Group ‎[330 bytes]
  292. (hist) ‎BCal Beam Test Plots, March 8, 2007 ‎[331 bytes]
  293. (hist) ‎Diamond Radiator Assessment with X-rays ‎[331 bytes]
  294. (hist) ‎Controls Meeting 22-Jan-2015 ‎[331 bytes]
  295. (hist) ‎Beam-induced background ‎[331 bytes]
  296. (hist) ‎Beam-induced backgrounds ‎[331 bytes]
  297. (hist) ‎Controls Meeting 10-Nov-2016 ‎[332 bytes]
  298. (hist) ‎Alignment ‎[332 bytes]
  299. (hist) ‎FCAL timing 7/1/15 ‎[333 bytes]
  300. (hist) ‎Controls Meeting 12-Aug-2021 ‎[333 bytes]
  301. (hist) ‎Controls Meeting 28-Jul-2022 ‎[333 bytes]
  302. (hist) ‎October 6, 2014 ‎[334 bytes]
  303. (hist) ‎GlueX TOF Meeting, June 16, 2021 ‎[334 bytes]
  304. (hist) ‎Controls Meeting 24-Mar-2022 ‎[334 bytes]
  305. (hist) ‎Wiring test ‎[335 bytes]
  306. (hist) ‎Tracking dE/dx update ‎[335 bytes]
  307. (hist) ‎HDGeant4 Meeting, July 31, 2018 ‎[335 bytes]
  308. (hist) ‎Programmable CAEN FPGA modules v1495 ‎[336 bytes]
  309. (hist) ‎Controls Meeting 4-Sep-2014 ‎[336 bytes]
  310. (hist) ‎DIRC LV Power Cycling Schedule ‎[337 bytes]
  311. (hist) ‎Online Software ‎[338 bytes]
  312. (hist) ‎TOF resolution ‎[338 bytes]
  313. (hist) ‎Controls Meeting 29-Sep-2022 ‎[338 bytes]
  314. (hist) ‎Private:JEF Detector Hardware ‎[338 bytes]
  315. (hist) ‎Jan 31, 2014 Design Meeting ‎[339 bytes]
  316. (hist) ‎GCC at JLab, March 2015 ‎[340 bytes]
  317. (hist) ‎Controls Meeting 22-Jul-2021 ‎[340 bytes]
  318. (hist) ‎First look at simulated GEMTRD hits ‎[340 bytes]
  319. (hist) ‎CD3 geometry forward-region material effects ‎[341 bytes]
  320. (hist) ‎BLTWG Meeting 10/30/2008 ‎[341 bytes]
  321. (hist) ‎GlueX Start Counter Meeting, April 29, 2021 ‎[341 bytes]
  322. (hist) ‎TOF-17Apr09 ‎[342 bytes]
  323. (hist) ‎Software Review January 6, 2015 ‎[342 bytes]
  324. (hist) ‎Removing FCAL cables from the detector ‎[342 bytes]
  325. (hist) ‎August 3, 2009 (11AM), Physics Working Group ‎[343 bytes]
  326. (hist) ‎FCALPhotos ‎[344 bytes]
  327. (hist) ‎Track impact at TOF ‎[344 bytes]
  328. (hist) ‎Controls Meeting 23-Jun-2016 ‎[344 bytes]
  329. (hist) ‎Study of effects of rotations/offsets with MC ‎[345 bytes]
  330. (hist) ‎February 23, 2023 ‎[347 bytes]
  331. (hist) ‎May 18, 2023 ‎[347 bytes]
  332. (hist) ‎June 8, 2023 ‎[347 bytes]
  333. (hist) ‎September 28, 2023 ‎[347 bytes]
  334. (hist) ‎November 30, 2023 ‎[347 bytes]
  335. (hist) ‎January 25, 2024 ‎[347 bytes]
  336. (hist) ‎Apr 21 ‎[348 bytes]
  337. (hist) ‎Veto counter ‎[350 bytes]
  338. (hist) ‎FCAL Insert Design Meetings ‎[350 bytes]
  339. (hist) ‎Gain Matching ‎[351 bytes]
  340. (hist) ‎IUCF Tests ‎[351 bytes]
  341. (hist) ‎Drift time comparison (gas check) ‎[351 bytes]
  342. (hist) ‎Hit pruning has been tuned and "broken track" recovery is now on by default ‎[352 bytes]
  343. (hist) ‎Ad Hoc Meetings ‎[354 bytes]
  344. (hist) ‎Controls Meeting 12-May-2016 ‎[354 bytes]
  345. (hist) ‎Sept 27, 2013 Design Meeting ‎[355 bytes]
  346. (hist) ‎Meetings-10-29-2020 ‎[356 bytes]
  347. (hist) ‎Mini Data Challenge Status, November 5, 2012 ‎[357 bytes]
  348. (hist) ‎GlueX PID Meeting, July 25, 2022 ‎[357 bytes]
  349. (hist) ‎GlueX PID Meeting, December 13, 2022 ‎[357 bytes]
  350. (hist) ‎Controls Meeting 30-Mar-2017 ‎[358 bytes]
  351. (hist) ‎GlueX PID Meeting, March 22, 2022 ‎[358 bytes]
  352. (hist) ‎GlueX PID Meeting, May 3, 2022 ‎[358 bytes]
  353. (hist) ‎August 29, 2022 FCAL Insert Installation Meeting ‎[358 bytes]
  354. (hist) ‎Aug 8, 2023 HallD AI/ML meeting ‎[358 bytes]
  355. (hist) ‎Mattione Study Spiral ‎[359 bytes]
  356. (hist) ‎Meeting-7-23-2020 ‎[359 bytes]
  357. (hist) ‎Aug 15, 2023 HallD AI/ML meeting ‎[359 bytes]
  358. (hist) ‎Aug 22, 2023 HallD AI/ML meeting ‎[359 bytes]
  359. (hist) ‎Aug 30, 2023 HallD AI/ML meeting ‎[359 bytes]
  360. (hist) ‎Aug 31, 2023 HallD AI/ML meeting ‎[359 bytes]
  361. (hist) ‎Pre-Brief materials ‎[360 bytes]
  362. (hist) ‎Trigger Commissioning Meetings ‎[360 bytes]
  363. (hist) ‎Solenoid Magnetic Field ‎[361 bytes]
  364. (hist) ‎Planning for bg MC production on the OSG ‎[361 bytes]
  365. (hist) ‎Tracking-5-12-2022 ‎[361 bytes]
  366. (hist) ‎Sep 5, 2023 HalD AI/ML meeting ‎[361 bytes]
  367. (hist) ‎Sep 5, 2023 HallD AI/ML meeting ‎[361 bytes]
  368. (hist) ‎GlueX Start Counter Meeting, August 5, 2021 ‎[362 bytes]
  369. (hist) ‎Plots for informal island algorithm discussion ‎[362 bytes]
  370. (hist) ‎Sep 19, 2023 HallD AI/ML meeting ‎[362 bytes]
  371. (hist) ‎Sep 26, 2023 HallD AI/ML meeting ‎[362 bytes]
  372. (hist) ‎GlueX TOF Meeting, January 15, 2020 ‎[363 bytes]
  373. (hist) ‎Meeting-3-18-2020 ‎[365 bytes]
  374. (hist) ‎Meetings-1-20-2021 ‎[365 bytes]
  375. (hist) ‎Jan 2, 2024 HallD AI/ML meeting ‎[366 bytes]
  376. (hist) ‎BLTWG Meeting 02/08/2010 ‎[367 bytes]
  377. (hist) ‎Tac run, May 2018 ‎[367 bytes]
  378. (hist) ‎January 14, 2019 ‎[367 bytes]
  379. (hist) ‎Nov 7, 2023 HallD AI/ML meeting ‎[367 bytes]
  380. (hist) ‎Dec 5, 2023 HallD AI/ML meeting ‎[367 bytes]
  381. (hist) ‎May 8, 2006 Software ‎[368 bytes]
  382. (hist) ‎PrimEx-Eta Weekly Meeting ‎[368 bytes]
  383. (hist) ‎Jan 18, 2024 HallD AI/ML meeting ‎[368 bytes]
  384. (hist) ‎Jan 23, 2024 HallD AI/ML meeting ‎[368 bytes]
  385. (hist) ‎HOWTO use the BCAL pi0 calibration scripts ‎[370 bytes]
  386. (hist) ‎Analysis Studies Fall2016 ‎[372 bytes]
  387. (hist) ‎OWG Meeting 17-Aug-2011 ‎[373 bytes]
  388. (hist) ‎Controls Meeting 5-Feb-2015 ‎[374 bytes]
  389. (hist) ‎CDC threshold scan procedure ‎[374 bytes]
  390. (hist) ‎Tracking-8-4-2022 ‎[375 bytes]
  391. (hist) ‎FCALLeadGlass ‎[376 bytes]
  392. (hist) ‎Solenoid Test in Hall-D ‎[377 bytes]
  393. (hist) ‎Controls Meeting 28-Jun-2018 ‎[377 bytes]
  394. (hist) ‎Controls Meeting 8-Aug-2019 ‎[377 bytes]
  395. (hist) ‎Proposed automated single-track diagnostics ‎[378 bytes]
  396. (hist) ‎SiPM Hamamatsu 3x3 : LED ‎[378 bytes]
  397. (hist) ‎Feb 28, 2014 Design Meeting ‎[379 bytes]
  398. (hist) ‎Apr. 14, 2008 Tracking CDC/FDC ‎[381 bytes]
  399. (hist) ‎Selected Schedule Milestones ‎[381 bytes]
  400. (hist) ‎Controls Meeting 2-Mar-2017 ‎[381 bytes]
  401. (hist) ‎GlueX TOF Meeting, March 25, 2020 ‎[381 bytes]
  402. (hist) ‎GlueX PID Meeting, April 18, 2023 ‎[381 bytes]
  403. (hist) ‎GlueX PID Meeting, May 16, 2023 ‎[381 bytes]
  404. (hist) ‎Review panel ‎[383 bytes]
  405. (hist) ‎Controls Meeting 30-Nov-2023 ‎[384 bytes]
  406. (hist) ‎Controls Meeting 25-Jan-2018 ‎[387 bytes]
  407. (hist) ‎Second Batch (160 crystals) ‎[388 bytes]
  408. (hist) ‎Controls Meeting 28-Oct-2021 ‎[388 bytes]
  409. (hist) ‎Feb 20, 2024 HallD AI/ML meeting ‎[388 bytes]
  410. (hist) ‎Mar 19, 2024 HallD AI/ML meeting ‎[388 bytes]
  411. (hist) ‎Apr 9, 2024 HallD AI/ML meeting ‎[388 bytes]
  412. (hist) ‎Controls Meeting 24-Jun-2015 ‎[389 bytes]
  413. (hist) ‎RC bylaw update ‎[391 bytes]
  414. (hist) ‎TOF HV SCAN 2022 ‎[391 bytes]
  415. (hist) ‎July 6, 2023 ‎[391 bytes]
  416. (hist) ‎Reconstruction, Aug 25, 2009 ‎[392 bytes]
  417. (hist) ‎Meeting-6-11-2020 ‎[392 bytes]
  418. (hist) ‎August 4, 2022 ‎[392 bytes]
  419. (hist) ‎Tracking-10-27-2022 ‎[393 bytes]
  420. (hist) ‎Runs to study systematics ‎[393 bytes]
  421. (hist) ‎Tracking resolution estimator (REZEST) ‎[394 bytes]
  422. (hist) ‎CDC garfield drift vs gas mix ‎[394 bytes]
  423. (hist) ‎November 9, 2023 ‎[394 bytes]
  424. (hist) ‎October 12, 2009 (11:15AM), Physics Working Group ‎[395 bytes]
  425. (hist) ‎January 11, 2024 ‎[395 bytes]
  426. (hist) ‎October 19, 2012 ‎[396 bytes]
  427. (hist) ‎Controls Meeting 15-Nov-2018 ‎[396 bytes]
  428. (hist) ‎Controls ‎[398 bytes]
  429. (hist) ‎Alignment and Calibration ‎[398 bytes]
  430. (hist) ‎Π polarizability Meeting Dec 14, 2020 ‎[398 bytes]
  431. (hist) ‎First CDC straw alignment offsets ‎[399 bytes]
  432. (hist) ‎Controls Meeting 11-Jul-2019 ‎[399 bytes]
  433. (hist) ‎Light monitoring system ‎[400 bytes]
  434. (hist) ‎Deprecated: EVO ‎[402 bytes]
  435. (hist) ‎Controls Meeting 24-Jul-2014 ‎[403 bytes]
  436. (hist) ‎January 18, 2024 ‎[404 bytes]
  437. (hist) ‎Controls Meeting 08-Mar-2018 ‎[405 bytes]
  438. (hist) ‎Mini FCAL Meeting Mon. Feb. 13, 2012 ‎[406 bytes]
  439. (hist) ‎February 22, 2024 ‎[406 bytes]
  440. (hist) ‎Calorimetry Archives ‎[407 bytes]
  441. (hist) ‎2012 Software Review Planning Meeting: June 1, 2012 ‎[408 bytes]
  442. (hist) ‎Trigger lignment plots ‎[408 bytes]
  443. (hist) ‎Meetings-8-6-2020 ‎[408 bytes]
  444. (hist) ‎Controls Meeting 7-Aug-2014 ‎[409 bytes]
  445. (hist) ‎Measurement Light Transmission ‎[410 bytes]
  446. (hist) ‎November 23, 2023 ‎[410 bytes]
  447. (hist) ‎Detector naming scheme ‎[411 bytes]
  448. (hist) ‎May 11 High Intensity Review ‎[411 bytes]
  449. (hist) ‎List of tasks and manpower ‎[411 bytes]
  450. (hist) ‎Third Batch (70 crystals) ‎[411 bytes]
  451. (hist) ‎Nodes at JLab for Data Challenge 2 ‎[413 bytes]
  452. (hist) ‎Controls Meeting 7-Jan-2016 ‎[413 bytes]
  453. (hist) ‎Meetings-8-29-2019 ‎[413 bytes]
  454. (hist) ‎Dec 9, 2022 ‎[413 bytes]
  455. (hist) ‎2007-07-18 ‎[414 bytes]
  456. (hist) ‎BoardAgenda201001 ‎[414 bytes]
  457. (hist) ‎Private:SiPM timing measurements ‎[414 bytes]
  458. (hist) ‎February xx, 2009 Physics ‎[415 bytes]
  459. (hist) ‎JLab Data Challenge Status, March 28, 2014 ‎[415 bytes]
  460. (hist) ‎Controls Meeting 12-Jul-2018 ‎[415 bytes]
  461. (hist) ‎Online-dirs-27-mar-2013 ‎[416 bytes]
  462. (hist) ‎Controls Meeting 17-Sep-2015 ‎[416 bytes]
  463. (hist) ‎Magnetic field for Outer PMts ‎[418 bytes]
  464. (hist) ‎June 21, 2010 (11AM), Physics Working Group ‎[418 bytes]
  465. (hist) ‎HDGeant4 Meeting, November 3, 2020 ‎[419 bytes]
  466. (hist) ‎Status of TOF voltage controls ‎[420 bytes]
  467. (hist) ‎Controls Meeting 29-May-2014 ‎[420 bytes]
  468. (hist) ‎Preamp 2 ‎[421 bytes]
  469. (hist) ‎CDC upd ‎[421 bytes]
  470. (hist) ‎Controls Meeting 21-Mar-2019 ‎[421 bytes]
  471. (hist) ‎CCDB Author List Maintenance ‎[422 bytes]
  472. (hist) ‎Private:Crate and channel assignment ‎[422 bytes]
  473. (hist) ‎Controls Meeting 21-Aug-2019 ‎[423 bytes]
  474. (hist) ‎Controls Meeting 22-Aug-2019 ‎[423 bytes]
  475. (hist) ‎Controls Meeting 25-Jan-2024 ‎[423 bytes]
  476. (hist) ‎May 8 2017 ‎[424 bytes]
  477. (hist) ‎Single Crate with the CTP ‎[426 bytes]
  478. (hist) ‎GlueX PID Meeting, February 8, 2022 ‎[426 bytes]
  479. (hist) ‎2016, Practice Talks ‎[427 bytes]
  480. (hist) ‎Coil Test Weekly Meeting 9-Jul-2009 ‎[428 bytes]
  481. (hist) ‎PS acceptance determination and photon flux ‎[428 bytes]
  482. (hist) ‎Tracking-6-9-2022 ‎[428 bytes]
  483. (hist) ‎September 21, 2015 ‎[429 bytes]
  484. (hist) ‎October 6, 2022 ‎[429 bytes]
  485. (hist) ‎Tracking-9-16-2021 ‎[430 bytes]
  486. (hist) ‎Physics Eta/Eta-prime Meetings ‎[431 bytes]
  487. (hist) ‎March 17, 2017 ‎[431 bytes]
  488. (hist) ‎February 15, 2024 ‎[431 bytes]
  489. (hist) ‎Controls Meeting 19-Sep-2019 ‎[433 bytes]
  490. (hist) ‎Controls Meeting 25-Feb-2021 ‎[433 bytes]
  491. (hist) ‎BLTWG Meeting 02/22/2010 ‎[434 bytes]
  492. (hist) ‎Controls Meeting 16-Mar-2017 ‎[435 bytes]
  493. (hist) ‎JEF meeting, January 6, 2023 ‎[436 bytes]
  494. (hist) ‎January 16, 2007 Software ‎[437 bytes]
  495. (hist) ‎Controls Meeting 25-Jul-2019 ‎[437 bytes]
  496. (hist) ‎Dec 1, 2011 SiPM Electrical and Cooling ‎[438 bytes]
  497. (hist) ‎December 1, 2022 ‎[438 bytes]
  498. (hist) ‎GlueX Target Design Mtg, July 31, 2013 ‎[439 bytes]
  499. (hist) ‎Controls Meeting 28-Jan-2021 ‎[439 bytes]
  500. (hist) ‎2008-01-02 ‎[440 bytes]

View (previous 500 | next 500) (20 | 50 | 100 | 250 | 500)