Difference between revisions of "Tagger and Beamline Review"

From GlueXWiki
Jump to: navigation, search
(Dry Run Schedule for the Review)
(Material Prepared for the Review)
Line 8: Line 8:
  
 
* <b>Pre-brief Material for the reviewers</b>
 
* <b>Pre-brief Material for the reviewers</b>
** GlueX-doc-1065 [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=1065 GlueX Physics and Detector Performance Metrics]
+
** GlueX-doc-1063 [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=1063 GlueX Physics and Detector Performance Metrics]
  
 
* <b>Final Talks</b>
 
* <b>Final Talks</b>

Revision as of 15:49, 30 September 2008

The Hall D/GlueX Tagger and Beamline Review

Material Prepared for the Review

Relevant Wiki Pages

Dry Run Schedule for the Review

  1. First round of dry runs (week of October 27)
    1. Monday L102/104 October 27
  2. Second round of dry runs (weeks of November 3 and 10)
    1. Wednesday F326/327 November 5
  3. Review: November 17 and 18.
  4. issues that need special attention