Difference between revisions of "Tagger and Beamline Review"
From GlueXWiki
(→Dry Run Schedule for the Review) |
(→Material Prepared for the Review) |
||
Line 8: | Line 8: | ||
* <b>Pre-brief Material for the reviewers</b> | * <b>Pre-brief Material for the reviewers</b> | ||
− | ** GlueX-doc- | + | ** GlueX-doc-1063 [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=1063 GlueX Physics and Detector Performance Metrics] |
* <b>Final Talks</b> | * <b>Final Talks</b> |
Revision as of 15:49, 30 September 2008
Contents
The Hall D/GlueX Tagger and Beamline Review
- Agenda
- November 17-18 Review Website (halld guest)
- Previous Reviews
Material Prepared for the Review
- Pre-brief Material for the reviewers
- GlueX-doc-1063 GlueX Physics and Detector Performance Metrics
- Final Talks
- GlueX-doc-1xxx GTemplate
Relevant Wiki Pages
- Description Photon Beam
- Biweekly Meetings
- Drawings (Tim)
Dry Run Schedule for the Review
- First round of dry runs (week of October 27)
- Monday L102/104 October 27
- Second round of dry runs (weeks of November 3 and 10)
- Wednesday F326/327 November 5
- Review: November 17 and 18.
- issues that need special attention