Difference between revisions of "Tagger and Beamline Review"

From GlueXWiki
Jump to: navigation, search
(First round of dry runs (week of October 27))
(Second round of dry runs (weeks of November 3 and 10))
Line 34: Line 34:
 
#Diamond Selection and Testing R. Jones
 
#Diamond Selection and Testing R. Jones
  
=== Second round of dry runs (weeks of November 3 and 10) ===
+
=== Second round of dry runs (week of November 10) ===
* Wednesday F326/327 November 5
+
* Thursday Nov 13 and Friday Nov 14
#Overview of Hall D Detector E. C. Aschenauer
+
 
 +
#Overview of Hall D Detector E. C. Aschenauer
 
#12 GeV Electron Beam Y. Roblin
 
#12 GeV Electron Beam Y. Roblin
 
#Photon Beam Overview R. Jones
 
#Photon Beam Overview R. Jones
Line 47: Line 48:
 
#Pair Spectrometer J. Stewart
 
#Pair Spectrometer J. Stewart
 
#Diamond Selection and Testing R. Jones
 
#Diamond Selection and Testing R. Jones
 +
 
=== Main Review ===
 
=== Main Review ===
 
# Review: November 19 and 20.
 
# Review: November 19 and 20.
 
# issues that need special attention
 
# issues that need special attention

Revision as of 08:12, 9 October 2008

The Hall D/GlueX Tagger and Beamline Review

Material Prepared for the Review

Relevant Wiki Pages

Dry Run Schedule for the Review

First round of dry runs (week of November 3rd)

  • Thursday Nov 6 and Friday Nov 7
  1. Overview of Hall D Detector E. C. Aschenauer
  2. 12 GeV Electron Beam Y. Roblin
  3. Photon Beam Overview R. Jones
  4. Beam Simulations A. Somov
  5. Photon Beam Line T. Whitlatch
  6. Magnet Design J. Stewart
  7. Tagger Optics D. Sober
  8. Fixed Array Hodoscope F. Klein
  9. Microscope I. Senderovich
  10. Pair Spectrometer J. Stewart
  11. Diamond Selection and Testing R. Jones

Second round of dry runs (week of November 10)

  • Thursday Nov 13 and Friday Nov 14
  1. Overview of Hall D Detector E. C. Aschenauer
  2. 12 GeV Electron Beam Y. Roblin
  3. Photon Beam Overview R. Jones
  4. Beam Simulations A. Somov
  5. Photon Beam Line T. Whitlatch
  6. Magnet Design J. Stewart
  7. Tagger Optics D. Sober
  8. Fixed Array Hodoscope F. Klein
  9. Microscope I. Senderovich
  10. Pair Spectrometer J. Stewart
  11. Diamond Selection and Testing R. Jones

Main Review

  1. Review: November 19 and 20.
  2. issues that need special attention