Difference between revisions of "Tagger and Beamline Review"

From GlueXWiki
Jump to: navigation, search
(First round of dry runs (week of November 3rd))
(First round of dry runs (week of November 3rd))
Line 22: Line 22:
 
* Thursday Nov 6 and Friday Nov 7
 
* Thursday Nov 6 and Friday Nov 7
  
#Overview of Hall D Detector E. C. Aschenauer
+
#Overview of Hall D Detector E. C. Aschenauer - none
#12 GeV Electron Beam Y. Roblin
+
#12 GeV Electron Beam Y. Roblin - Nov 10
#Photon Beam Overview R. Jones  - Nov6 9:00
+
#Photon Beam Overview R. Jones  - Nov 6 9:00 10:30
#Beam Simulations A. Somov
+
#Beam Simulations A. Somov - Nov 6 10:30 12:00
#Photon Beam Line T. Whitlatch  
+
#Photon Beam Line T. Whitlatch - Nov 7 10:30-12:00
#Magnet Design J. Stewart
+
#Magnet Design J. Stewart - Nov 7 2:15 - 4:00
#Tagger Optics D. Sober
+
#Tagger Optics D. Sober - Nov6 3:30 - 5:00
#Fixed Array Hodoscope F. Klein
+
#Fixed Array Hodoscope F. Klein - Nov 10
#Microscope I. Senderovich
+
#Microscope I. Senderovich Nov 6 - 3:30pm- 4:30pm
#Pair Spectrometer J. Stewart
+
#Pair Spectrometer J. Stewart - Nov 6 2:15 3:30
#Diamond Selection and Testing R. Jones
+
#Diamond Selection and Testing R. Jones - Nov 7 9:00 - 10:30
  
 
Richard not available 12:00 - 14:00
 
Richard not available 12:00 - 14:00

Revision as of 10:00, 9 October 2008

The Hall D/GlueX Tagger and Beamline Review

Material Prepared for the Review

Relevant Wiki Pages

Dry Run Schedule for the Review

First round of dry runs (week of November 3rd)

  • Thursday Nov 6 and Friday Nov 7
  1. Overview of Hall D Detector E. C. Aschenauer - none
  2. 12 GeV Electron Beam Y. Roblin - Nov 10
  3. Photon Beam Overview R. Jones - Nov 6 9:00 10:30
  4. Beam Simulations A. Somov - Nov 6 10:30 12:00
  5. Photon Beam Line T. Whitlatch - Nov 7 10:30-12:00
  6. Magnet Design J. Stewart - Nov 7 2:15 - 4:00
  7. Tagger Optics D. Sober - Nov6 3:30 - 5:00
  8. Fixed Array Hodoscope F. Klein - Nov 10
  9. Microscope I. Senderovich Nov 6 - 3:30pm- 4:30pm
  10. Pair Spectrometer J. Stewart - Nov 6 2:15 3:30
  11. Diamond Selection and Testing R. Jones - Nov 7 9:00 - 10:30

Richard not available 12:00 - 14:00

Second round of dry runs (week of November 10)

  • Thursday Nov 13 and Friday Nov 14
  1. Overview of Hall D Detector E. C. Aschenauer
  2. 12 GeV Electron Beam Y. Roblin
  3. Photon Beam Overview R. Jones
  4. Beam Simulations A. Somov
  5. Photon Beam Line T. Whitlatch
  6. Magnet Design J. Stewart
  7. Tagger Optics D. Sober
  8. Fixed Array Hodoscope F. Klein
  9. Microscope I. Senderovich
  10. Pair Spectrometer J. Stewart
  11. Diamond Selection and Testing R. Jones

Main Review

  1. Review: November 19 and 20.
  2. issues that need special attention