Difference between revisions of "Tagger and Beamline Review"

From GlueXWiki
Jump to: navigation, search
(First round of dry runs (week of November 3rd))
Line 21: Line 21:
 
== Dry Run Schedule for the Review ==
 
== Dry Run Schedule for the Review ==
 
=== First round of dry runs (week of November 3rd) ===
 
=== First round of dry runs (week of November 3rd) ===
* Thursday Nov 6 and Friday Nov 7
+
* Thursday Nov 6 Friday Nov 7 and monday Nov 10
  
#Overview of Hall D Detector E. C. Aschenauer - none
+
 
#12 GeV Electron Beam Y. Roblin - Nov 10
+
*Nov 6 9:00 10:30     R. Jones        Photon Beam Overview
#Photon Beam Overview R. Jones - Nov 6 9:00 10:30
+
*Nov 6 10:30 12:00     A. Somov        Beam Simulations
#Beam Simulations A. Somov - Nov 6 10:30 12:00
+
*Nov 6 2:15 3:30       J. Stewart       Pair Spectrometer
#Photon Beam Line T. Whitlatch - Nov 7 10:30-12:00
+
*Nov 6 3:30 - 5:00     D. Sober        Tagger Optics
#Magnet Design J. Stewart - Nov 7 2:15 - 4:00
+
*Nov 6 3:30pm- 4:30pm I. Senderovich  Microscope
#Tagger Optics D. Sober - Nov 6 3:30 - 5:00
+
 
#Fixed Array Hodoscope F. Klein - Nov 10
+
*Nov 7 9:00 - 10:30     R. Jones        Diamond Selection and Testing
#Microscope I. Senderovich Nov 6 - 3:30pm- 4:30pm
+
*Nov 7 10:30-12:00      T. Whitlatch    Photon Beam Line
#Pair Spectrometer J. Stewart - Nov 6 2:15 3:30
+
*Nov 7 2:15 - 4:00     J. Stewart      Magnet Design
#Diamond Selection and Testing R. Jones - Nov 7 9:00 - 10:30
+
 
 +
*Nov 10                 F. Klein        Fixed Array Hodoscope
 +
*Nov 10      Y. Roblin            12 GeV Electron Beam      
  
 
Richard not available 12:00 - 14:00
 
Richard not available 12:00 - 14:00

Revision as of 09:25, 16 October 2008

The Hall D/GlueX Tagger and Beamline Review

Material Prepared for the Review

Relevant Wiki Pages

Dry Run Schedule for the Review

First round of dry runs (week of November 3rd)

  • Thursday Nov 6 Friday Nov 7 and monday Nov 10


  • Nov 6 9:00 10:30 R. Jones Photon Beam Overview
  • Nov 6 10:30 12:00 A. Somov Beam Simulations
  • Nov 6 2:15 3:30 J. Stewart Pair Spectrometer
  • Nov 6 3:30 - 5:00 D. Sober Tagger Optics
  • Nov 6 3:30pm- 4:30pm I. Senderovich Microscope
  • Nov 7 9:00 - 10:30 R. Jones Diamond Selection and Testing
  • Nov 7 10:30-12:00 T. Whitlatch Photon Beam Line
  • Nov 7 2:15 - 4:00 J. Stewart Magnet Design
  • Nov 10 F. Klein Fixed Array Hodoscope
  • Nov 10 Y. Roblin 12 GeV Electron Beam

Richard not available 12:00 - 14:00

Second round of dry runs (week of November 10)

  • Thursday Nov 13 and Friday Nov 14
  1. Overview of Hall D Detector E. C. Aschenauer Friday Nov 14 8am -9am
  2. 12 GeV Electron Beam Y. Roblin
  3. Photon Beam Overview R. Jones
  4. Beam Simulations A. Somov
  5. Photon Beam Line T. Whitlatch
  6. Magnet Design J. Stewart
  7. Tagger Optics D. Sober
  8. Fixed Array Hodoscope F. Klein
  9. Microscope I. Senderovich
  10. Pair Spectrometer J. Stewart
  11. Diamond Selection and Testing R. Jones

Main Review

  1. Review: November 19 and 20.
  2. issues that need special attention