Difference between revisions of "Tagger and Beamline Review"

From GlueXWiki
Jump to: navigation, search
(Second round of dry runs (week of November 10))
(Second round of dry runs (week of November 10))
Line 54: Line 54:
  
 
*Tuesday, November 11, 2008 Room F326/327
 
*Tuesday, November 11, 2008 Room F326/327
1:00 - 2:30  12 GeV Electron Beam         Y. Roblin
+
*#*1:00 - 2:30  12 GeV Electron Beam         Y. Roblin
  
 
*Wednesday, November 12, 2008 Room F326/327
 
*Wednesday, November 12, 2008 Room F326/327
Line 61: Line 61:
  
 
*Thursday, November 13, 2008 Room F326/327
 
*Thursday, November 13, 2008 Room F326/327
8:00-9:00  Microscope                         I. Senderovich
+
**8:00-9:00  Microscope                         I. Senderovich
9:00-10:00  Tagger Optics                 D. Sober
+
**9:00-10:00  Tagger Optics                 D. Sober
10:00-11:30 Magnet Design                 J. Stewart
+
**10:00-11:30 Magnet Design                 J. Stewart
3:00-4:30  Diamond Selection and Testing R. Jones
+
**3:00-4:30  Diamond Selection and Testing R. Jones
  
 
*Friday, November 14, 2008 Room F326/327
 
*Friday, November 14, 2008 Room F326/327
8:00-9:00  Overview of Hall D Detector        E. C. Aschenauer  
+
**8:00-9:00  Overview of Hall D Detector        E. C. Aschenauer  
9:00-10:30  Photon Beam Line                 T. Whitlatch  
+
**9:00-10:30  Photon Beam Line                 T. Whitlatch  
10:30-12:00 Fixed Array Hodoscope         F. Klein
+
**10:30-12:00 Fixed Array Hodoscope         F. Klein
2:30-4:00  Pair Spectrometer         J. Stewart
+
**2:30-4:00  Pair Spectrometer         J. Stewart
  
 
=== Main Review ===
 
=== Main Review ===
 
# Review: November 19 and 20.
 
# Review: November 19 and 20.
 
# issues that need special attention
 
# issues that need special attention

Revision as of 10:16, 22 October 2008

The Hall D/GlueX Tagger and Beamline Review

Material Prepared for the Review

  • Pre-brief Material for the reviewers
  1. General Documents
  2. Tagging Spectrometer
  3. Electron Machine
  4. Pair Spectrometer

Relevant Wiki Pages

Dry Run Schedule for the Review

First round of dry runs (week of November 3rd)

  • Thursday Nov 6 Friday Nov 7 and monday Nov 10


  • Nov 6 9:00 - 10:30 (F326/327) R. Jones Photon Beam Overview
  • Nov 6 10:30 - 12:00 (F326/327) A. Somov Beam Simulations
  • Nov 6 2:15 - 3:30 (F326/327) J. Stewart Pair Spectrometer
  • Nov 6 3:30- 4:30 (F326/327) I. Senderovich Microscope
  • Nov 6 4:30 - 5:30 (F326/327) D. Sober Tagger Optics
  • -
  • Nov 7 9:00 - 10:30 (L207) R. Jones Diamond Selection and Testing
  • Nov 7 10:30-12:00 (L207) T. Whitlatch Photon Beam Line
  • Nov 7 2:15 - 4:00 (F326/327) F. Klein Fixed Array Hodoscope
  • -
  • Nov 10 9:00 - 10:30 (F326/327) J. Stewart Magnet Design
  • Nov 10 1:00 - 2:30 (F326/327) Y. Roblin 12 GeV Electron Beam

Richard not available 12:00 - 14:00

Second round of dry runs (week of November 10)

  • Tuesday Nov 11 thru Friday Nov 14
  • Tuesday, November 11, 2008 Room F326/327
      • 1:00 - 2:30 12 GeV Electron Beam Y. Roblin
  • Wednesday, November 12, 2008 Room F326/327
    • 9:00-10:30 Beam Simulations A. Somov
    • 3:30-5:00 Photon Beam Overview R. Jones
  • Thursday, November 13, 2008 Room F326/327
    • 8:00-9:00 Microscope I. Senderovich
    • 9:00-10:00 Tagger Optics D. Sober
    • 10:00-11:30 Magnet Design J. Stewart
    • 3:00-4:30 Diamond Selection and Testing R. Jones
  • Friday, November 14, 2008 Room F326/327
    • 8:00-9:00 Overview of Hall D Detector E. C. Aschenauer
    • 9:00-10:30 Photon Beam Line T. Whitlatch
    • 10:30-12:00 Fixed Array Hodoscope F. Klein
    • 2:30-4:00 Pair Spectrometer J. Stewart

Main Review

  1. Review: November 19 and 20.
  2. issues that need special attention