Difference between revisions of "Tagger and Beamline Review"

From GlueXWiki
Jump to: navigation, search
(Dry Run Schedule for the Review)
Line 19: Line 19:
  
 
== Dry Run Schedule for the Review ==
 
== Dry Run Schedule for the Review ==
# First round of dry runs (week of October 27)  
+
=== First round of dry runs (week of October 27) ===
## Monday L102/104 October 27
+
* Monday L102/104 October 27
# Second round of dry runs (weeks of November 3 and 10)  
+
#Overview of Hall D Detector E. C. Aschenauer
## Wednesday F326/327 November 5
+
#12 GeV Electron Beam Y. Roblin
 +
#Photon Beam Overview R. Jones
 +
#Beam Simulations A. Somov
 +
#Photon Beam Line T. Whitlatch
 +
#Magnet Design J. Stewart
 +
#Tagger Optics D. Sober
 +
#Fixed Array Hodoscope F. Klein
 +
#Microscope I. Senderovich
 +
#Pair Spectrometer J. Stewart
 +
#Diamond Selection and Testing R. Jones
 +
 
 +
=== Second round of dry runs (weeks of November 3 and 10) ===
 +
* Wednesday F326/327 November 5
 +
#Overview of Hall D Detector E. C. Aschenauer
 +
#12 GeV Electron Beam Y. Roblin
 +
#Photon Beam Overview R. Jones
 +
#Beam Simulations A. Somov
 +
#Photon Beam Line T. Whitlatch
 +
#Magnet Design J. Stewart
 +
#Tagger Optics D. Sober
 +
#Fixed Array Hodoscope F. Klein
 +
#Microscope I. Senderovich
 +
#Pair Spectrometer J. Stewart
 +
#Diamond Selection and Testing R. Jones
 +
=== Main Review ===
 
# Review: November 19 and 20.
 
# Review: November 19 and 20.
 
# issues that need special attention
 
# issues that need special attention

Revision as of 18:46, 8 October 2008

The Hall D/GlueX Tagger and Beamline Review

Material Prepared for the Review

Relevant Wiki Pages

Dry Run Schedule for the Review

First round of dry runs (week of October 27)

  • Monday L102/104 October 27
  1. Overview of Hall D Detector E. C. Aschenauer
  2. 12 GeV Electron Beam Y. Roblin
  3. Photon Beam Overview R. Jones
  4. Beam Simulations A. Somov
  5. Photon Beam Line T. Whitlatch
  6. Magnet Design J. Stewart
  7. Tagger Optics D. Sober
  8. Fixed Array Hodoscope F. Klein
  9. Microscope I. Senderovich
  10. Pair Spectrometer J. Stewart
  11. Diamond Selection and Testing R. Jones

Second round of dry runs (weeks of November 3 and 10)

  • Wednesday F326/327 November 5
  1. Overview of Hall D Detector E. C. Aschenauer
  2. 12 GeV Electron Beam Y. Roblin
  3. Photon Beam Overview R. Jones
  4. Beam Simulations A. Somov
  5. Photon Beam Line T. Whitlatch
  6. Magnet Design J. Stewart
  7. Tagger Optics D. Sober
  8. Fixed Array Hodoscope F. Klein
  9. Microscope I. Senderovich
  10. Pair Spectrometer J. Stewart
  11. Diamond Selection and Testing R. Jones

Main Review

  1. Review: November 19 and 20.
  2. issues that need special attention