Line 35: Line 35:
  
  
*Nov 6 9:00 - 10:30 (F326/327)    R. Jones         Photon Beam Overview
+
*Thursday, November 6, 2008 Room F326/327
*Nov 6 10:30 - 12:00 (F326/327)    A. Somov         Beam Simulations
+
**9:00 - 10:30     Photon Beam Overview                    R. Jones
*Nov 6 2:15 - 3:30 (F326/327)      J. Stewart       Pair Spectrometer
+
**10:30 - 12:00     Beam Simulations                        A. Somov  
*Nov 6 3:30- 4:30 (F326/327) I. Senderovich   Microscope
+
**2:15 - 3:30       Pair Spectrometer                      J. Stewart  
*Nov 6 4:30 - 5:30 (F326/327)    D. Sober         Tagger Optics
+
**3:30- 4:30       Microscope                              I. Senderovich  
 +
**4:30 - 5:30       Tagger Optics                          D. Sober  
 
* -
 
* -
*Nov 7 9:00 - 10:30 (L207)     R. Jones        Diamond Selection and Testing
+
*Friday, November 7, 2008 Room F326/327 and L207
*Nov 7 10:30-12:00 (L207)     T. Whitlatch     Photon Beam Line  
+
**9:00 - 10:30 (L207)   Diamond Selection and Testing     R. Jones
*Nov 7 2:15 - 4:00 (F326/327)     F. Klein         Fixed Array Hodoscope
+
**10:30-12:00 (L207)    Photon Beam Line                   T. Whitlatch 
 +
**2:15 - 4:00 (F326/327)   Fixed Array Hodoscope            F. Klein
 
* -
 
* -
*Nov 10 9:00 - 10:30 (F326/327)  J. Stewart       Magnet Design
+
*Monday, November 10, 2008 Room F326/327
*Nov 10  1:00 - 2:30 (F326/327)  Y. Roblin        12 GeV Electron Beam      
+
**9:00 - 10:30       Magnet Design                        J. Stewart
 +
**1:00 - 2:30         12 GeV Electron Beam             Y. Roblin     
  
 
Richard not available 12:00 - 14:00
 
Richard not available 12:00 - 14:00

Revision as of 10:24, 22 October 2008

The Hall D/GlueX Tagger and Beamline Review

Material Prepared for the Review

  • Pre-brief Material for the reviewers
  1. General Documents
  2. Tagging Spectrometer
  3. Electron Machine
  4. Pair Spectrometer

Relevant Wiki Pages

Dry Run Schedule for the Review

First round of dry runs (week of November 3rd)

  • Thursday Nov 6 Friday Nov 7 and monday Nov 10


  • Thursday, November 6, 2008 Room F326/327
    • 9:00 - 10:30 Photon Beam Overview R. Jones
    • 10:30 - 12:00 Beam Simulations A. Somov
    • 2:15 - 3:30 Pair Spectrometer J. Stewart
    • 3:30- 4:30 Microscope I. Senderovich
    • 4:30 - 5:30 Tagger Optics D. Sober
  • -
  • Friday, November 7, 2008 Room F326/327 and L207
    • 9:00 - 10:30 (L207) Diamond Selection and Testing R. Jones
    • 10:30-12:00 (L207) Photon Beam Line T. Whitlatch
    • 2:15 - 4:00 (F326/327) Fixed Array Hodoscope F. Klein
  • -
  • Monday, November 10, 2008 Room F326/327
    • 9:00 - 10:30 Magnet Design J. Stewart
    • 1:00 - 2:30 12 GeV Electron Beam Y. Roblin

Richard not available 12:00 - 14:00

Second round of dry runs (week of November 10)

  • Tuesday Nov 11 thru Friday Nov 14
  • Tuesday, November 11, 2008 Room F326/327
    • 1:00 - 2:30 12 GeV Electron Beam Y. Roblin
  • Wednesday, November 12, 2008 Room F326/327
    • 9:00-10:30 Beam Simulations A. Somov
    • 3:30-5:00 Photon Beam Overview R. Jones
  • Thursday, November 13, 2008 Room F326/327
    • 8:00-9:00 Microscope I. Senderovich
    • 9:00-10:00 Tagger Optics D. Sober
    • 10:00-11:30 Magnet Design J. Stewart
    • 3:00-4:30 Diamond Selection and Testing R. Jones
  • Friday, November 14, 2008 Room F326/327
    • 8:00-9:00 Overview of Hall D Detector E. C. Aschenauer
    • 9:00-10:30 Photon Beam Line T. Whitlatch
    • 10:30-12:00 Fixed Array Hodoscope F. Klein
    • 2:30-4:00 Pair Spectrometer J. Stewart

Main Review

  1. Review: November 19 and 20.
  2. issues that need special attention