Tagger and Beamline Review

From GlueXWiki
Revision as of 10:02, 9 October 2008 by Jstewart (Talk | contribs) (Second round of dry runs (week of November 10))

Jump to: navigation, search

The Hall D/GlueX Tagger and Beamline Review

Material Prepared for the Review

Relevant Wiki Pages

Dry Run Schedule for the Review

First round of dry runs (week of November 3rd)

  • Thursday Nov 6 and Friday Nov 7
  1. Overview of Hall D Detector E. C. Aschenauer - none
  2. 12 GeV Electron Beam Y. Roblin - Nov 10
  3. Photon Beam Overview R. Jones - Nov 6 9:00 10:30
  4. Beam Simulations A. Somov - Nov 6 10:30 12:00
  5. Photon Beam Line T. Whitlatch - Nov 7 10:30-12:00
  6. Magnet Design J. Stewart - Nov 7 2:15 - 4:00
  7. Tagger Optics D. Sober - Nov6 3:30 - 5:00
  8. Fixed Array Hodoscope F. Klein - Nov 10
  9. Microscope I. Senderovich Nov 6 - 3:30pm- 4:30pm
  10. Pair Spectrometer J. Stewart - Nov 6 2:15 3:30
  11. Diamond Selection and Testing R. Jones - Nov 7 9:00 - 10:30

Richard not available 12:00 - 14:00

Second round of dry runs (week of November 10)

  • Thursday Nov 13 and Friday Nov 14
  1. Overview of Hall D Detector E. C. Aschenauer Friday Nov 14 8am -9am
  2. 12 GeV Electron Beam Y. Roblin
  3. Photon Beam Overview R. Jones
  4. Beam Simulations A. Somov
  5. Photon Beam Line T. Whitlatch
  6. Magnet Design J. Stewart
  7. Tagger Optics D. Sober
  8. Fixed Array Hodoscope F. Klein
  9. Microscope I. Senderovich
  10. Pair Spectrometer J. Stewart
  11. Diamond Selection and Testing R. Jones

Main Review

  1. Review: November 19 and 20.
  2. issues that need special attention