The Hall D/GlueX Tagger and Beamline Review

Material Prepared for the Review

Relevant Wiki Pages

Dry Run Schedule for the Review

First round of dry runs (week of November 3rd)

  • Thursday Nov 6 Friday Nov 7 and monday Nov 10


  • Nov 6 9:00 10:30 R. Jones Photon Beam Overview
  • Nov 6 10:30 12:00 A. Somov Beam Simulations
  • Nov 6 2:15 3:30 J. Stewart Pair Spectrometer
  • Nov 6 3:30pm- 4:30pm I. Senderovich Microscope
  • Nov 6 4:30 - 5:30 D. Sober Tagger Optics
  • -
  • Nov 7 9:00 - 10:30 R. Jones Diamond Selection and Testing
  • Nov 7 10:30-12:00 T. Whitlatch Photon Beam Line
  • Nov 7 2:15 - 4:00 F. Klein Fixed Array Hodoscope
  • -
  • Nov 10 J. Stewart Magnet Design
  • Nov 10 Y. Roblin 12 GeV Electron Beam

Richard not available 12:00 - 14:00

Second round of dry runs (week of November 10)

  • Thursday Nov 13 and Friday Nov 14
  1. Overview of Hall D Detector E. C. Aschenauer Friday Nov 14 8am -9am
  2. 12 GeV Electron Beam Y. Roblin
  3. Photon Beam Overview R. Jones
  4. Beam Simulations A. Somov
  5. Photon Beam Line T. Whitlatch
  6. Magnet Design J. Stewart
  7. Tagger Optics D. Sober
  8. Fixed Array Hodoscope F. Klein
  9. Microscope I. Senderovich
  10. Pair Spectrometer J. Stewart
  11. Diamond Selection and Testing R. Jones

Main Review

  1. Review: November 19 and 20.
  2. issues that need special attention