Difference between revisions of "Tracking-1-19-2023"

From GlueXWiki
Jump to: navigation, search
(Created page with "# [https://jlab-org.zoomgov.com/j/1619020033?pwd=NlRKeU9lSzhFc3FIVE5hS1dBOTF3dz09 meeting link to zoomgov] # [https://halldweb.jlab.org/wiki/index.php/FDC_Meetings meeting pag...")
 
(Minutes)
 
(8 intermediate revisions by 2 users not shown)
Line 3: Line 3:
 
Thu 1/19/2023 2pm
 
Thu 1/19/2023 2pm
 
= Agenda =
 
= Agenda =
# Run preparations:
+
# Detector status:
 
#* CDC   
 
#* CDC   
 
#* FDC
 
#* FDC
Line 12: Line 12:
  
 
= Minutes =
 
= Minutes =
 +
# CDC - [https://logbooks.jlab.org/entry/4111358 HV scan looks good] but [https://logbooks.jlab.org/entry/4113027 currents are higher than usual] The max current CDC may have during the high-intensity test is 1 uA per straw, i.e. < 20 uA for the inner HV channels.
 +
# FDC - the problem with half amplitudes in the FDC was solved - bad LV connector on the patch panel. Now using a spare connector but need to fix it after the end of the run.
 +
# GEM-TRD - the readout foil that was shipped from CERN to Australia finally arrived at the right destination - UVa. They will continue with the assembly of the large scale prototype beginning of February and promise to be ready second half of Feb.
 +
 +
 +
Naomi claims the record for southernmost GlueX meeting participation (Puerto Natales).

Latest revision as of 17:59, 27 January 2023

  1. meeting link to zoomgov
  2. meeting page

Thu 1/19/2023 2pm

Agenda

  1. Detector status:
    • CDC
    • FDC
  2. Tracking
  3. GEM-TRD
  4. Other

Minutes

  1. CDC - HV scan looks good but currents are higher than usual The max current CDC may have during the high-intensity test is 1 uA per straw, i.e. < 20 uA for the inner HV channels.
  2. FDC - the problem with half amplitudes in the FDC was solved - bad LV connector on the patch panel. Now using a spare connector but need to fix it after the end of the run.
  3. GEM-TRD - the readout foil that was shipped from CERN to Australia finally arrived at the right destination - UVa. They will continue with the assembly of the large scale prototype beginning of February and promise to be ready second half of Feb.


Naomi claims the record for southernmost GlueX meeting participation (Puerto Natales).