Difference between revisions of "Tracking-4-14-2022"

From GlueXWiki
Jump to: navigation, search
(Minutes)
Line 13: Line 13:
 
# Detector update
 
# Detector update
 
#* CDC  
 
#* CDC  
** Naomi mentioned that Torri presented the results of the AIEC cosmics robo-CDC tests at the P&A meeting [https://halldweb.jlab.org/DocDB/0055/005556/001/AIEC_P%26A_Apr6.pdf the slides are here].  
+
#** Naomi mentioned that Torri presented the results of the AIEC cosmics robo-CDC tests at the P&A meeting [https://halldweb.jlab.org/DocDB/0055/005556/001/AIEC_P%26A_Apr6.pdf the slides are here].  
** We discussed what (unusual things) to expect during the upcoming CPP run.
+
#** We discussed what (unusual things) to expect during the upcoming CPP run.
***ROC CDC 1 has been requisitioned for the MWPCs.
+
#***ROC CDC 1 has been requisitioned for the MWPCs.
***The target is a thin solid lead target at z=1cm, so the tracks will be much more forward than usual, expect more saturated hits in the CDC.
+
#***The target is a thin solid lead target at z=1cm, so the tracks will be much more forward than usual, expect more saturated hits in the CDC.
***The beam current is low, 50nA, and the solenoid will be on.  
+
#***The beam current is low, 50nA, and the solenoid will be on.  
***The trigger is TOF+FCAL + BCAL but we don't expect as many tracks in BCAL as usual, because of the target position.  We might benefit from a BCAL trigger just for the CDC HV scan, as this took 5x longer than usual for PrimEx, and it was just lucky that the pressure did not change during that time.  Sean processed the data with a special BCAL skim to speed up the analysis.  Naomi will email Elton to start some discussion on this.  
+
#***The trigger is TOF+FCAL + BCAL but we don't expect as many tracks in BCAL as usual, because of the target position.  We might benefit from a BCAL trigger just for the CDC HV scan, as this took 5x longer than usual for PrimEx, and it was just lucky that the pressure did not change during that time.  Sean processed the data with a special BCAL skim to speed up the analysis.  Naomi will email Elton to start some discussion on this.  
 
#* FDC
 
#* FDC
**Lubomir is still away.
+
#**Lubomir is still away.
 
# GEM-TRD
 
# GEM-TRD
 
#* Sergey reported that he and Kondo are still working on the design for the full sized (50x70cm) GEM TRD prototype. The prototype should be ready by Oct/Nov, and there should be enough electronics to instrument half of it in 1-2years. At $100 per channel it's not cheap.
 
#* Sergey reported that he and Kondo are still working on the design for the full sized (50x70cm) GEM TRD prototype. The prototype should be ready by Oct/Nov, and there should be enough electronics to instrument half of it in 1-2years. At $100 per channel it's not cheap.

Revision as of 14:24, 14 April 2022

  1. meeting link to zoomgov
  2. List of tracking meetings

Thu 4/14/2022 2pm

Agenda

  1. Detector update
    • CDC
    • FDC
  2. Tracking
  3. GEM-TRD
  4. Other

Minutes

  1. Detector update
    • CDC
      • Naomi mentioned that Torri presented the results of the AIEC cosmics robo-CDC tests at the P&A meeting the slides are here.
      • We discussed what (unusual things) to expect during the upcoming CPP run.
        • ROC CDC 1 has been requisitioned for the MWPCs.
        • The target is a thin solid lead target at z=1cm, so the tracks will be much more forward than usual, expect more saturated hits in the CDC.
        • The beam current is low, 50nA, and the solenoid will be on.
        • The trigger is TOF+FCAL + BCAL but we don't expect as many tracks in BCAL as usual, because of the target position. We might benefit from a BCAL trigger just for the CDC HV scan, as this took 5x longer than usual for PrimEx, and it was just lucky that the pressure did not change during that time. Sean processed the data with a special BCAL skim to speed up the analysis. Naomi will email Elton to start some discussion on this.
    • FDC
      • Lubomir is still away.
  2. GEM-TRD
    • Sergey reported that he and Kondo are still working on the design for the full sized (50x70cm) GEM TRD prototype. The prototype should be ready by Oct/Nov, and there should be enough electronics to instrument half of it in 1-2years. At $100 per channel it's not cheap.