Difference between revisions of "User:Pmatt"
From GlueXWiki
(→Responsibilities) |
|||
Line 1: | Line 1: | ||
− | == | + | == Work Flow == |
+ | * [[Mattione_WorkFlow | Work Flow]] | ||
+ | |||
- GlueX: | - GlueX: | ||
- Misc. software problems: | - Misc. software problems: |
Revision as of 19:52, 14 October 2011
Work Flow
- GlueX: - Misc. software problems: - fix disttort quiet_nan returns - see list - Track Reconstruction Fixes: - take notes on Kalman Filter - fitting/disentanglement of low momentum track spirals - track hit selection - slow track reconstruction (and mcsmear) - look into speed losses due to vector sorts (jana doesn't preserve sorted order anyway), fitting - only track fit one PID hypothesis per charge if possible (do study to see when possible) - PID: - BCAL Segmentation PID Study: - DC dE/dx Chi-squared: - Timing Chi-squared: - TOF/BCAL/FCAL Uncertainties - BCAL, FCAL/TOF dE/dx and Chi-squared: - Software Reorganization: - Neutron reconstruction: - CLAS: - g13: - Two-baryon Study - ppm cross section - K*0 and Sigma*- cross sections - K0, Lambda Polarization Observables - acceptance studies - g14: - Online Analysis Studies - notify/get-approval-from curtis & reinhard, organize trip to JLab in mid-November - Run Coordinator - talk to Reinhard, figure out best time to sign up - CLAS12/GlueX: - eventual k0 lambda high energy analysis (LOI, proposal, etc.)
Updates
- b1pi Update 06/01/2011
- b1pi Update 06/20/2011
- b1pi Update 08/10/2011
- Uncertainties Update 09/07/2011
- Uncertainties Update 09/21/2011
Tracking Studies
Code Modification
PID
- GlueX Particle ID Presentation Slides
- Reconstruction Tasks and Topics for Further Development
- BCAL Segmentation Study
- DC dE/dx Study