GlueX Logo

GlueX Experiment Document 1440-v3

DocDB Home ]  [ Portal Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ] [ List Events ]

Straw Assembly Details for the CDC

Document #:
GlueX-doc-1440-v3
Document type:
Technical Note
Submitted by:
Curtis A. Meyer
Updated by:
Curtis A. Meyer
Document Created:
11 Mar 2010, 13:47
Contents Revised:
19 Oct 2010, 07:35
Metadata Revised:
19 Oct 2010, 07:35
Viewable by:
  • Public document
Modifiable by:
  • Same as Viewable by

Quick Links:
Latest Version

Other Versions:
GlueX-doc-1440-v2
11 Oct 2010, 10:36
GlueX-doc-1440-v1
19 May 2010, 15:01
Abstract:
This document describes the selection, cutting cleaning, assembly and insertion of straws into the CDC.
Files in Document:
Keywords:
central drift chambers
Related Documents:
Referenced by:
  • GlueX-doc-1532: CDC Straw-tube acceptance criteria
  • GlueX-doc-1440: Straw Assembly Details for the CDC
  • GlueX-doc-1534: CDC Aluminum Feedthru Acceptance Procedures
  • GlueX-doc-1533: CDC Aluminum Donut Check Procedure.
  • GlueX-doc-1280: CDC Assembly Procedure
  • GlueX-doc-1438: The CDC Construction Contract Package
  • GlueX-doc-1619: CDC Quality Assurance Plan
  • GlueX-doc-1451: CDC Endplate Alignment Procedures.
  • GlueX-doc-1623: CDC: Glueing Donuts into straws
  • GlueX-doc-1624: CDC: Cutting and cleaning straw tubes.
  • GlueX-doc-1625: CDC: Insert straws into the frame and glue in place
  • GlueX-doc-1626: CDC: Acceptance Checks for Pin Holders
  • GlueX-doc-1627: CDC: Preliminary Electrical Hook-up Procedures
  • GlueX-doc-1628: CDC: Outer shell installation procedure
  • GlueX-doc-1629: CDC: Performance Checks
  • GlueX-doc-1630: CDC: CMU Clean-room Procedures
  • GlueX-doc-1632: CDC: Wire tension Measurement
  • GlueX-doc-1633: CDC: Preliminary Down-stream Plenum installation.
DocDB Home ]  [ Portal Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ] [ List Events ]

DocDB Version 8.8.6, contact Document Database Administrators