GlueX Experiment Document 1440-v3
[
DocDB Home
] [
Portal Home
] [
Search
] [
Last 20 Days
] [
List Authors
] [
List Topics
] [
List Events
]
Straw Assembly Details for the CDC
Document #:
GlueX-doc-1440-v3
Document type:
Technical Note
Submitted by:
Curtis A. Meyer
Updated by:
Curtis A. Meyer
Document Created:
11 Mar 2010, 13:47
Contents Revised:
19 Oct 2010, 07:35
Metadata Revised:
19 Oct 2010, 07:35
Viewable by:
Public document
Modifiable by:
Same as Viewable by
Quick Links:
Latest Version
Other Versions:
GlueX-doc-1440-v2
11 Oct 2010, 10:36
GlueX-doc-1440-v1
19 May 2010, 15:01
Abstract:
This document describes the selection, cutting cleaning, assembly and insertion of straws into the CDC.
Files in Document:
docx document
(Straw Assembly Details.docx, 133.8 kB)
pdf file
(Straw Assembly Details.pdf, 64.5 kB)
Topics:
Detector Hardware
:
CDC
Authors:
Curtis A. Meyer
Keywords:
central
drift
chambers
Related Documents:
GlueX-doc-1440:
Straw Assembly Details for the CDC
GlueX-doc-1441:
CDC Wire Stringing Procedures
GlueX-doc-1442:
CDC Assembly Tests Summary
GlueX-doc-1451:
CDC Endplate Alignment Procedures.
GlueX-doc-1533:
CDC Aluminum Donut Check Procedure.
GlueX-doc-1534:
CDC Aluminum Feedthru Acceptance Procedures
GlueX-doc-1532:
CDC Straw-tube acceptance criteria
Referenced by:
GlueX-doc-1532:
CDC Straw-tube acceptance criteria
GlueX-doc-1440:
Straw Assembly Details for the CDC
GlueX-doc-1534:
CDC Aluminum Feedthru Acceptance Procedures
GlueX-doc-1533:
CDC Aluminum Donut Check Procedure.
GlueX-doc-1280:
CDC Assembly Procedure
GlueX-doc-1438:
The CDC Construction Contract Package
GlueX-doc-1619:
CDC Quality Assurance Plan
GlueX-doc-1451:
CDC Endplate Alignment Procedures.
GlueX-doc-1623:
CDC: Glueing Donuts into straws
GlueX-doc-1624:
CDC: Cutting and cleaning straw tubes.
GlueX-doc-1625:
CDC: Insert straws into the frame and glue in place
GlueX-doc-1626:
CDC: Acceptance Checks for Pin Holders
GlueX-doc-1627:
CDC: Preliminary Electrical Hook-up Procedures
GlueX-doc-1628:
CDC: Outer shell installation procedure
GlueX-doc-1629:
CDC: Performance Checks
GlueX-doc-1630:
CDC: CMU Clean-room Procedures
GlueX-doc-1632:
CDC: Wire tension Measurement
GlueX-doc-1633:
CDC: Preliminary Down-stream Plenum installation.
[
DocDB Home
] [
Portal Home
] [
Search
] [
Last 20 Days
] [
List Authors
] [
List Topics
] [
List Events
]
DocDB
Version 8.8.6, contact
Document Database Administrators