GlueX Logo

Document List by Topic

DocDB Home ]  [ Portal Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ] [ List Events ]

These documents on Central Drift Chambers (subtopic of Detector Hardware) are available:
(List events on Central Drift Chambers)

GlueX-doc-# Title Author(s) Topic(s) Last Updated
5324-v3 AI for experiment control and calibration - IOP NPG talk 7 Oct 2021 Naomi Jarvis Calibration
Machine Learning
CDC
07 Oct 2021
855-v2 Specification Document for FDC/CDC ADC (125 MSPS) G. Visser Data Rates
DAQ
CDC
Trigger
Readout
Frontend
FDC
Electronics
13 Sep 2019
1005-v1 GAS-1 ASIC - Description, Measurements and Status Mitch Newcomer CDC
Readout
Frontend
FDC
13 Sep 2019
3393-v1 Calibrations for charged particle tracking and measurements of omega photo production with the GlueX detector Michael Staib GlueX Experiment
Alignment
Analysis
GlueX Physics
CDC
General
Log-likelihood fitting
Particle Tracking
FDC
Detector Hardware
24 Oct 2017
2362-v1 Detector Voltages Managing Application (Presentation) Hovannes Egiyan et al. BCAL
Controls
CDC
Presentation
FDC
07 Nov 2013
1441-v3 CDC Wire Stringing Procedures Curtis A. Meyer CDC
19 Oct 2010
979-v2 CDC Design Layout Curtis A. Meyer et al. CDC
17 Jul 2008
1532-v7 CDC Straw-tube acceptance criteria Curtis A. Meyer CDC
29 Sep 2011
1727-v2 Charged particle tracking for the gluex detector Simon Taylor Tracking
CDC
Reconstruction
FDC
01 May 2011
1440-v3 Straw Assembly Details for the CDC Curtis A. Meyer CDC
19 Oct 2010
1534-v4 CDC Aluminum Feedthru Acceptance Procedures Curtis A. Meyer CDC
19 Oct 2010
1533-v4 CDC Aluminum Donut Check Procedure. Curtis A. Meyer CDC
19 Oct 2010
1451-v1 CDC Endplate Alignment Procedures. Curtis A. Meyer Calibration
CDC
13 Oct 2010
1442-v2 CDC Assembly Tests Summary Curtis A. Meyer CDC
11 Oct 2010
1575-v1 The GlueX CDC Curtis A. Meyer CDC
07 Sep 2010
1379-v8 Central Drift Chamber straw radiation test results Yves VanHaarlem CDC
10 Mar 2010
1343-v1 Charge Division measurements in a 2m long CDC prototype for z-position tracking in GlueX Biplab Dey CDC
10 Sep 2009
1332-v1 Charge Division measurements with CDC prototype for $z$-position tracking in GlueX Biplab Dey et al. CDC
08 Sep 2009
1220-v2 Charge Division Measurement with CDC Prototype for GlueX Biplab Dey et al. CDC
08 Sep 2009
1243-v3 CDC Gas Flow Curtis A. Meyer CDC
01 Jun 2009
1132-v3 The Effect of the CDC/FDC Gap on Charged Particle Resolution in GlueX Mark Ito CDC
FDC
26 May 2009
1265-v1 CDC Design Updates Curtis A. Meyer CDC
Presentation
12 May 2009
1191-v1 Tracking Studies and the CDC David Lawrence CDC
Reconstruction
General
27 Jan 2009
928-v3 The CDC High Voltage Distribution Board Curtis A. Meyer et al. CDC
Electronics
Electrical
04 Nov 2008
1095-v2 M.C. Studies of CDC Axial/Stereo layer configuration David Lawrence CDC
Reconstruction
18 Sep 2008
990-v11 The GlueX Central Drift Chamber Curtis A. Meyer et al. Hall D Project Review
CDC
Design Report
Presentation
17 Jul 2008
1075-v1 Alternative ways to simulate a detector Mark Ito CDC
Particle Tracking
FDC
25 Jun 2008
736-v3 Receiver/Shaper Prototype for FDC&CDC for use with Struck ADC's G. Visser CDC
Frontend
FDC
Electronics
18 Mar 2008
931-v2 Some studies of GAS-1 at IUCF G. Visser CDC
Readout
Frontend
FDC
Electronics
13 Feb 2008
882-v1 The Status of the Central Drift Chamber Curtis A. Meyer CDC
23 Oct 2007
869-v1 Flash ADC Documentation and Software From Crystal Barrel Curtis A. Meyer CDC
Reconstruction
12 Oct 2007
764-v4 Budget Justifications for the GlueX Central Drift Chamber Curtis A. Meyer Budget
Design Report
CDC
Overview
23 Jul 2007
805-v4 Drift Chamber Material Budget Daniel S. Carman et al. CDC
FDC
29 Jun 2007
746-v9 The GlueX Central Drift Chamber Curtis A. Meyer CDC
01 Mar 2007
744-v7 The GlueX Central Drift Chamber Curtis A. Meyer CDC
23 Feb 2007
737-v3 CDC Design Parameters Curtis A. Meyer et al. CDC
20 Feb 2007
692-v2 Update on the CDC -- October 2006 Collaboration Meeting Curtis A. Meyer CDC
12 Oct 2006
604-v2 GlueX CDC Update and Electronics Outlook Mike McCracken CDC
Presentation
Electronics
27 Apr 2006
571-v1 Budget Justification for the CDC 3-Year R&D Effort Curtis A. Meyer Budget
Beam Test
General
Tracking
CDC
Test Beam
12 Dec 2005
542-v1 The GlueX Straw-tube Chamber Curtis A. Meyer CDC
Presentation
08 Nov 2005
528-v1 Track Finding in GlueX Development Report II David Lawrence Data Rates
CDC
FDC
General
02 Sep 2005
520-v1 Preamp noise comparison G. Visser CDC
Frontend
FDC
03 Jun 2005
323-v6 Brief Summaries of Detector Systems GlueX Collaboration Hall D Project Review
UPV
Start Counter
BCAL
Cherenkov
Tagger
CDC
FCAL
Target
Particle Tracking
TOF
FDC
21 Apr 2005
388-v1 A Study of Vertex Resolution in GlueX Curtis A. Meyer CDC
Particle Tracking
Vertex
18 Nov 2004
363-v2 The GlueX Central Drift Chamber Curtis A. Meyer Hall D Project Review
CDC
18 Oct 2004
346-v2 The GlueX Detector Review Mini-Design-Report GlueX Collaboration Hall D Project Review
12 Oct 2004
280-v2 A summary of straw-tube chamber tests Zebulun Krahn et al. Hall D Project Review
CDC
21 Sep 2004
275-v1 The GlueX CDC Curtis A. Meyer CDC
09 Sep 2004
283-v1 CDC Scrutineer Talk Elliott Wolin CDC
09 Sep 2004
146-v1 CDC Prototype Development: An Update Zebulun Krahn CDC
08 Jul 2004
61-v1 Accuracy Measurements of the Straw-tube chamber End Plates Curtis A. Meyer CDC
28 May 2003
62-v1 Gas Composition Study for the Straw Tube Chamber in the GlueX Detector at Jefferson Lab Zebulun Krahn et al. CDC
01 Nov 2002
54-v1 A Study of the Straw Tube Detector for the GlueX Detector at Jefferson Lab Zebulun Krahn et al. CDC
14 Jul 2002

Number of documents found: 53

DocDB Home ]  [ Portal Home ]  [ Search ] [ Last 20 Days ] [ List Authors ] [ List Topics ] [ List Events ]

DocDB Version 8.8.6, contact Document Database Administrators
Execution time: 2 wallclock secs ( 0.59 usr + 0.15 sys = 0.74 CPU)