Difference between revisions of "Short Term Run Plan"

From Hall D Ops Wiki
Jump to: navigation, search
(Special instructions)
(Run conditions)
Line 13: Line 13:
 
[https://halldweb.jlab.org/online/whiteboard/ Hall D counting room whiteboard]
 
[https://halldweb.jlab.org/online/whiteboard/ Hall D counting room whiteboard]
  
* Radiator: JD70-103 50 um diamond (4 orientations: 0, 90, 45, -45)
+
<s>* Radiator: JD70-103 50 um diamond (4 orientations: 0, 90, 45, -45)
 
* Collimator: 5.0 mm
 
* Collimator: 5.0 mm
 
* TPOL converter: Be 75 um
 
* TPOL converter: Be 75 um
Line 22: Line 22:
 
* Setup: FCAL_BCAL_PS_m9
 
* Setup: FCAL_BCAL_PS_m9
 
* Production: PHYSICS_DIRC  
 
* Production: PHYSICS_DIRC  
* (Raw mode: PHYSICS_DIRC_RAW)
+
* (Raw mode: PHYSICS_DIRC_RAW)</s>
  
 
== Run plan ==
 
== Run plan ==

Revision as of 14:49, 3 April 2025

Do reload this page, it gets updated frequently.

Current Experiment

Rare Eta Decay & GlueX II (with DIRC)

  • Experiment number: E12-12-002 (use in BTA shift information)
  • Proposal
  • Spokesperson: C. A. Meyer

Notes

  • All GlueX detectors (including DIRC)

Run conditions

Hall D counting room whiteboard

* Radiator: JD70-103 50 um diamond (4 orientations: 0, 90, 45, -45)

  • Collimator: 5.0 mm
  • TPOL converter: Be 75 um
  • Runs are no more than 2 hours (~400M triggers)- see whiteboard for the production cycle
  • Target: Liquid Hydrogen

DAQ configuration

  • Setup: FCAL_BCAL_PS_m9
  • Production: PHYSICS_DIRC
  • (Raw mode: PHYSICS_DIRC_RAW)

Run plan

See the daily plan in Run Coordination Meetings:Spring2023 and also the counting house whiteboard

Shift duties

Shift Leader

Shift Worker