Difference between revisions of "Collect Beam Data for Detector Checkout"
From Hall D Ops Wiki
(→Main Page) |
(→Collect Beam Data for Detector Checkout) |
||
Line 8: | Line 8: | ||
# Goal: Collect 5 days of beam data. | # Goal: Collect 5 days of beam data. | ||
# Responsibility: HallD | # Responsibility: HallD | ||
+ | # Priority: High | ||
# Conditions: | # Conditions: | ||
#* Tagger hall equipment in place and operating. | #* Tagger hall equipment in place and operating. |
Revision as of 14:26, 2 July 2014
Contents
Main Page
Tune Electron Beam
Tune Photon Beam
One Week Pause in Running
Collect Beam Data for Detector Checkout
- Goal: Collect 5 days of beam data.
- Responsibility: HallD
- Priority: High
- Conditions:
- Tagger hall equipment in place and operating.
- Beam 50nA CW
- Radiator is 10-4.
- Collimator hole is 3.5mm.
- Solenoid on at 1200A
- GlueX detectors are on.
- Thin commissioning target at nominal position.
- Activities
- Verify photon beam position and background levels.
- Take data with the regular trigger for five days