Difference between revisions of "Collect Beam Data for Detector Checkout"
From Hall D Ops Wiki
(→Collect Beam Data for Detector Checkout) |
(→Collect Beam Data for Detector Checkout) |
||
(3 intermediate revisions by 2 users not shown) | |||
Line 1: | Line 1: | ||
__TOC__ | __TOC__ | ||
− | ==[[Fall 2014 Commissioning Plan|Main Page]]== | + | ==[[Fall 2014 Commissioning Plan#Collect Beam Data for Detector Checkout|Main Page]]== |
+ | |||
==[[Tune Electron Beam]]== | ==[[Tune Electron Beam]]== | ||
==[[Tune Photon Beam]]== | ==[[Tune Photon Beam]]== | ||
==[[One Week Pause in Running]]== | ==[[One Week Pause in Running]]== | ||
==Collect Beam Data for Detector Checkout== | ==Collect Beam Data for Detector Checkout== | ||
− | + | * Goal: Collect 5 days of beam data. | |
− | + | * Schedule: Oct 19-23 (starting at the end of the previous step, duration 5 days) | |
− | + | * Responsibility: Hall D | |
− | + | * Priority: High | |
− | #* | + | * Prerequisites: |
− | # | + | # Tagger Hall equipment installed and tested |
− | # | + | # Solenoid current 1200 A |
− | + | # Collimator in the "plug" position | |
− | + | # Target 10 mm HDPE plastic at nominal position | |
− | # | + | # Hall D detectors are ON |
− | # | + | # Tagger Hall detectors are OFF |
− | # | + | |
− | # | + | * Activities |
+ | # Re-establish 50 µA CW electron beam (Accelerator) | ||
+ | # Re-establish photon beam using 1.7·10<sup>-5</sup> radiator | ||
+ | # Check the Tagger radiation levels. Turn the Tagger Hall detectors ON. Verify the tagger rates. Check the rates/levels with no radiator, 1.7 and 11·10<sup>-5</sup> radiators. | ||
+ | # Move the collimator to the nominal position (5 mm hole) with the beam off, turn the beam on and adjust the beam position using the Active Collimator signals | ||
+ | # Perform PS wire scan | ||
+ | # Verify the trigger rate. Select the beam current (50-100 nA) and the radiator thickness (1.7-11·10<sup>-5</sup>) in order to optimize it | ||
+ | # Take data with the regular trigger for five days | ||
==[[Optimize Detector Settings]]== | ==[[Optimize Detector Settings]]== | ||
==[[Drift Chamber Alignment]]== | ==[[Drift Chamber Alignment]]== | ||
==[[Collect More Regular Data]]== | ==[[Collect More Regular Data]]== |
Latest revision as of 12:48, 7 August 2014
Contents
[hide]Main Page
Tune Electron Beam
Tune Photon Beam
One Week Pause in Running
Collect Beam Data for Detector Checkout
- Goal: Collect 5 days of beam data.
- Schedule: Oct 19-23 (starting at the end of the previous step, duration 5 days)
- Responsibility: Hall D
- Priority: High
- Prerequisites:
- Tagger Hall equipment installed and tested
- Solenoid current 1200 A
- Collimator in the "plug" position
- Target 10 mm HDPE plastic at nominal position
- Hall D detectors are ON
- Tagger Hall detectors are OFF
- Activities
- Re-establish 50 µA CW electron beam (Accelerator)
- Re-establish photon beam using 1.7·10-5 radiator
- Check the Tagger radiation levels. Turn the Tagger Hall detectors ON. Verify the tagger rates. Check the rates/levels with no radiator, 1.7 and 11·10-5 radiators.
- Move the collimator to the nominal position (5 mm hole) with the beam off, turn the beam on and adjust the beam position using the Active Collimator signals
- Perform PS wire scan
- Verify the trigger rate. Select the beam current (50-100 nA) and the radiator thickness (1.7-11·10-5) in order to optimize it
- Take data with the regular trigger for five days