Difference between revisions of "Drift Chamber Alignment"
From Hall D Ops Wiki
(→Drift Chamber Alignment) |
(→Main Page) |
||
Line 1: | Line 1: | ||
__TOC__ | __TOC__ | ||
− | ==[[Fall 2014 Commissioning Plan|Main Page]]== | + | ==[[Fall 2014 Commissioning Plan#Drift Chamber Alignment|Main Page]]== |
+ | |||
==[[Tune Electron Beam]]== | ==[[Tune Electron Beam]]== | ||
==[[Tune Photon Beam]]== | ==[[Tune Photon Beam]]== |
Revision as of 12:12, 2 July 2014
Contents
Main Page
Tune Electron Beam
Tune Photon Beam
One Week Pause in Running
Collect Beam Data for Detector Checkout
Optimize Detector Settings
Drift Chamber Alignment
- Goal: Collect data with no or low field.
- Responsibility: HallD
- Conditions:
- Tagger hall equipment in place and operating.
- Beam 50nA CW
- Radiator is 10-4.
- Collimator hole is 3.5mm.
- Solenoid 0-300A depending on backgrounds.
- GlueX detectors are on.
- Thin commissioning target at various positions.
- Activities
- If time permits, collect data with target in several positions.