Collect More Regular Data
From Hall D Ops Wiki
Contents
Main Page
Tune Electron Beam
Tune Photon Beam
One Week Pause in Running
Collect Beam Data for Detector Checkout
Optimize Detector Settings
Drift Chamber Alignment
Collect More Regular Data
- Goal: Collect data for calibration and characterization of the detector.
- Responsibility: HallD
- Conditions:
- Tagger hall equipment in place and operating.
- Beam 50nA CW
- Radiator is 10-4.
- Collimator hole is 3.5mm.
- Solenoid 1200A.
- GlueX detectors are on.
- Thin commissioning target at various positions.
- Activities
- If time permits, and all other tasks are done
- Take enough data for preliminary calibration and alignment of the detector. At least one week of running.