Collect Beam Data for Detector Checkout
- Goal: Collect 5 days of beam data.
- Responsibility: HallD
- Priority: High
- Conditions:
- Tagger hall equipment in place and operating.
- Beam 50nA CW
- Radiator is 10-4.
- Collimator hole is 3.5mm.
- Solenoid on at 1200A
- GlueX detectors are on.
- Thin commissioning target at nominal position.
- Activities
- Verify photon beam position and background levels.
- Take data with the regular trigger for five days