# Goal: Collect 5 days of beam data.
 
# Goal: Collect 5 days of beam data.
 
# Responsibility: HallD
 
# Responsibility: HallD
 +
# Priority: High
 
# Conditions:
 
# Conditions:
 
#* Tagger hall equipment in place and operating.
 
#* Tagger hall equipment in place and operating.

Revision as of 14:26, 2 July 2014

Main Page

Tune Electron Beam

Tune Photon Beam

One Week Pause in Running

Collect Beam Data for Detector Checkout

  1. Goal: Collect 5 days of beam data.
  2. Responsibility: HallD
  3. Priority: High
  4. Conditions:
    • Tagger hall equipment in place and operating.
    • Beam 50nA CW
    • Radiator is 10-4.
    • Collimator hole is 3.5mm.
    • Solenoid on at 1200A
    • GlueX detectors are on.
    • Thin commissioning target at nominal position.
  5. Activities
    • Verify photon beam position and background levels.
    • Take data with the regular trigger for five days

Optimize Detector Settings

Drift Chamber Alignment

Collect More Regular Data