Difference between revisions of "Collect More Regular Data"

From Hall D Ops Wiki
Jump to: navigation, search
(Collect More Regular Data)
(Main Page)
Line 1: Line 1:
 
__TOC__
 
__TOC__
==[[Fall 2014 Commissioning Plan|Main Page]]==
+
==[[Fall 2014 Commissioning Plan#Collect More Regular Data|Main Page]]==
 +
 
 
==[[Tune Electron Beam]]==
 
==[[Tune Electron Beam]]==
 
==[[Tune Photon Beam]]==
 
==[[Tune Photon Beam]]==

Revision as of 12:12, 2 July 2014

Main Page

Tune Electron Beam

Tune Photon Beam

One Week Pause in Running

Collect Beam Data for Detector Checkout

Optimize Detector Settings

Drift Chamber Alignment

Collect More Regular Data

  1. Goal: Collect data for calibration and characterization of the detector.
  2. Responsibility: HallD
  3. Conditions:
    • Tagger hall equipment in place and operating.
    • Beam 50nA CW
    • Radiator is 10-4.
    • Collimator hole is 3.5mm.
    • Solenoid 1200A.
    • GlueX detectors are on.
    • Thin commissioning target at various positions.
  4. Activities
    • If time permits, and all other tasks are done
    • Take enough data for preliminary calibration and alignment of the detector. At least one week of running.