Difference between revisions of "Fall 2014 Commissioning Plan"

From Hall D Ops Wiki
Jump to: navigation, search
(Replaced content with "__TOC__ ==Tune Electron Beam== ==Tune Photon Beam== ==One Week Pause in Running== ==Collect Beam Data for Detector Checkout== ==[[Optimize Detector Setting...")
Line 1: Line 1:
 
__TOC__
 
__TOC__
 +
* Expected Staffing:
 +
** Run Coordinator: To be named
 +
** Online Shifts:  3 persons per shift, one with solenoid training.
 +
** Offline Shifts: at least two people looking at data written to tape.
 +
* Coordination Activities:
 +
** MCC meeting at 7:00am
 +
** Daily run meeting broadcast on bluejeans 10:30am??
 
==[[Tune Electron Beam]]==
 
==[[Tune Electron Beam]]==
 
==[[Tune Photon Beam]]==
 
==[[Tune Photon Beam]]==

Revision as of 12:04, 2 July 2014

  • Expected Staffing:
    • Run Coordinator: To be named
    • Online Shifts: 3 persons per shift, one with solenoid training.
    • Offline Shifts: at least two people looking at data written to tape.
  • Coordination Activities:
    • MCC meeting at 7:00am
    • Daily run meeting broadcast on bluejeans 10:30am??

Tune Electron Beam

Tune Photon Beam

One Week Pause in Running

Collect Beam Data for Detector Checkout

Optimize Detector Settings

Drift Chamber Alignment

Collect More Regular Data