Difference between revisions of "Fall 2014 Commissioning Plan"

From Hall D Ops Wiki
Jump to: navigation, search
(Tune Electron Beam#Tune Electron Beam)
Line 17: Line 17:
 
** Running data at 1350A solenoid current.
 
** Running data at 1350A solenoid current.
 
=Run Plan=
 
=Run Plan=
==[[Tune Electron Beam#Tune Electron Beam Tune Electron Beam]]==
+
==[[Tune Electron Beam]]==
  
==[[Tune Photon Beam#Tune Photon Beam]]==
+
==[[Tune Photon Beam]]==
==[[One Week Pause in Running#One Week Pause in Running]]==
+
==[[One Week Pause in Running]]==
==[[Collect Beam Data for Detector Checkout#Collect Beam Data for Detector Checkout]]==
+
==[[Collect Beam Data for Detector Checkout]]==
==[[Optimize Detector Settings#Optimize Detector Settings]]==
+
==[[Optimize Detector Settings]]==
==[[Drift Chamber Alignment#Drift Chamber Alignment]]==
+
==[[Drift Chamber Alignment]]==
==[[Collect More Regular Data#Collect More Regular Data]]==
+
==[[Collect More Regular Data]]==

Revision as of 12:59, 2 July 2014

General Information

  • Expected Staffing:
    • Run Coordinator: To be named
    • Online Shifts: 3 persons per shift, one with solenoid training.
    • Offline Shifts: at least two people looking at data written to tape.
  • Coordination Activities:
    • MCC meeting at 7:00am
    • Daily run meeting broadcast on bluejeans 10:30am??
  • Activity Priority
    • High: Activity should be completed, contingencies in place for issues.
    • Medium: Desirable to complete the activity.
    • Low: Activity would be useful if time permits us to do it.
  • Deferred Activity
    • Installation of liquid hydrogen target.
    • Installation of diamond radiator in goniometer.
    • Running data at 1350A solenoid current.

Run Plan

Tune Electron Beam

Tune Photon Beam

One Week Pause in Running

Collect Beam Data for Detector Checkout

Optimize Detector Settings

Drift Chamber Alignment

Collect More Regular Data