Difference between revisions of "Hall D Commissioning"

From Hall D Ops Wiki
Jump to: navigation, search
(Created page with "<table cellpadding="3"><tr> <td width=350 bgcolor="#e0e0f0"> Systems </td> </tr><tr> <td bgcolor="#e0e0f0" valign="top"> * [[Beam Line Detectors Commissioning| Beam Line Detec...")
 
 
(13 intermediate revisions by 5 users not shown)
Line 1: Line 1:
 +
==Commissioning and Running Plans==
 +
* [[Fall 2014 Commissioning Plan]]
 +
* [[Spring 2015 Commissioning Plan]]
 +
* [[Spring 2015 6GeV Commissioning Plan]]
 +
*[https://halldweb.jlab.org/wiki/index.php/Fall_2015_Commissioning_Plan Fall 2015 Commissioning Plan]
 +
*[https://halldweb.jlab.org/wiki/index.php/Run_Coordination_Meetings:_Spring_2016_Run Spring 2016 Commissioning Plan]
 
<table cellpadding="3"><tr>
 
<table cellpadding="3"><tr>
 
<td width=350 bgcolor="#e0e0f0"> Systems </td>
 
<td width=350 bgcolor="#e0e0f0"> Systems </td>
Line 7: Line 13:
 
* [[Pair Spectrometer Commissioning | Pair Spectrometer]]  
 
* [[Pair Spectrometer Commissioning | Pair Spectrometer]]  
 
* [[Solenoid Commissioning | Solenoid]]  
 
* [[Solenoid Commissioning | Solenoid]]  
* [[Cryogenic Target Commissioning | Cryogenic Target]]  
+
* [https://hdops.jlab.org/wiki/index.php/Cryogenic_Target_Shift  Cryogenic Target]
* [[Solid Target Commissioning | Solid Target]]  
+
* [https://hdops.jlab.org/wiki/index.php/Solid_Target_Shift  Solid Target]
 
* [[Electronics Commissioning | Electronics]]  
 
* [[Electronics Commissioning | Electronics]]  
 
* [[Slow Controls Commissioning | Slow Controls]]  
 
* [[Slow Controls Commissioning | Slow Controls]]  
 +
* [[Trigger | Trigger]]
 
* [[Data Acquisition Commissioning | Data Acquisition]]  
 
* [[Data Acquisition Commissioning | Data Acquisition]]  
 
* [[Online Monitoring Commissioning | Online Monitoring]]  
 
* [[Online Monitoring Commissioning | Online Monitoring]]  
 +
* [[Offline Analysis Commissioning | Offline Data Analysis]]
 
* [[Gas System Commissioning | Gas System]]  
 
* [[Gas System Commissioning | Gas System]]  
 
* [[Forward Drift Chamber Commissioning | Forward Drift Chamber]]  
 
* [[Forward Drift Chamber Commissioning | Forward Drift Chamber]]  

Latest revision as of 11:46, 29 September 2016

Commissioning and Running Plans

Systems


Information for Shift-Takers